BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in San Gabriel, California. Contact the soliciting agency for additional information.

The City of San Gabriel is located approximately 10 miles northeast of the City of Los Angeles within the western San Gabriel Valley sub region of the greater Los Angeles metropolitan area and was incorporated in 1913 as a general law city which operates under the council-manager form of government. The City Council is comprised of five members who are elected at large serving a staggered term of four years. The City provides a full range of municipal services including police and fire protection, engineering and planning, street maintenance, traffic control, code enforcement, parks and recreation services, and general administrative activities. Today, San Gabriel is an ethnically and socio-economically diverse city. It is a built-out community and, as a result, new development is almost entirely adaptive reuse, intensification, and replacement. It has not experienced significant population growth since the 1990s, a decade during which the City grew by 7.3 percent and added nearly 2,700 new residents. During the 2000s, San Gabriel's population increased by on l y 0 .3 percent. The City encompasses 4.1 square miles of predominately flat land area with a population of 41,255 and is developed with a mix of residential and commercial uses, as well as limited institutional, industrial and parkland uses. Deadline to submit written questions August 26, 2022 Responses to questions issued September 5, 2022 Interviews Week of September 26, 2022 Contract approved by City Council October 18, 2022 Project kickoff October 24, 2022 Clarifications/questions regarding the RFP should be directed in writing via email or letter only to the designated contact person. Only questions that have been resolved in writing will be binding. Telephone communications with City staff are not encouraged, but will be permitted. Oral and other interpretations or clarifications will be without legal or contractual effect. All proposals will be opened and declared publicly. The scope of services will be for three years, with the possibility of certain tasks resulting in a continuing services agreement with the City. The volume of work will be determined by the number and type of applications submitted to the City of San Gabriel which require architectural review. There is no guaranteed level of work implied. The City reservesthe right to: Reject any or all proposals prior to the execution of the contract(s), with no penalty to the City of San Gabriel; The method of Contractor Selection has not been Determined at this time

Conceptual

Transportation Terminals

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
538
Active Projects
266
Bidding Soon
3,785
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2023

Project location map

Multiple Locations, San Gabriel, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.