BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a playground / park / athletic field in East Point, Georgia. Working plans call for outdoor lighting for a playground / park / athletic field.

The City of East Point is seeking proposals from financially stable providers, for John D. Milner Park Exterior Athletic Lighting. The Selected Provider will be tasked with the demolition and disposal of existing fixtures and crossarms, installation of new fixtures and crossarms and electrical distribution in its' entirety. The RFP response submitted should detail the Provider's conceptual approach to fulfilling these requirements. Please see the scope of services and technical requirements for further details and instructions. There is no guarantee that the City of East Point, Georgia will utilize the services of any firm or individual responding to this Request for Proposal (RFP). The Selected Provider shall furnish all materials, equipment, tools, supplies, and labor necessary to complete the required services as described herein and to the specifications as directed including all incidentals as determined by the East Point City Power Director or his/her representative. All questions shall be directed to the City of East Point, via email tdjones@eastpointcity.org no later than 12:00 PM, Friday, September 02, 2022. The sports lighting will be for the following venues: Baseball Field 1 Baseball Field 2 Baseball Field 3 Baseball Field 4 Football Field Demo and dispose of existing fixtures and crossarms. Provide and Install new lighting Control Panel with contactors in existing electrical room at concessions/restroom building. Provide and install 120V control circuit to lighting control cabinet for remote on/off control and monitoring Install new crossarms, fixtures, electrical component enclosures and wire harnesses per manufacturer requirements. Make all necessary electrical connections to ensure lighting system is fully operational Position fixtures according to lighting manufacturer specifications Coordinate with lighting manufacturer representative and commission Contractor shall submit installation warranty on company letterhead for no less than one year Keep all heavy equipment off of playing fields. Repair damage to grounds that exceeds that which would be expected. Indentations caused by heavy equipment traveling over dry ground would be an example of expected damage. Ruts and sod damage caused by equipment traveling over wet grounds would be an example of damage requiring repair.

Final Planning

Playgrounds / Parks / Athletic Fields

$200,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
52
Bidding Soon
1,515
All Active Projects
573
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2022

October 10, 2022

img_map_placeholder

3009 Randall St, East Point, GA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.