BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 11, 2022 at 8:00 PM

Updated September 15, 2023

Site work and paving for a road / highway in Warsaw, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

FEDERAL PROJECT NUMBER(S): FAF 65-3(108), FAF 65-3(118), FAF 54-2(16), FAF 65-3(119), FAF 65-3(120), FAF 65-2(115) (1): Job J7P3212 Route 65 BENTON County. Resurface from the Osage River in Warsaw to 0.4 mile south of Route MM, the total length of improvement being 4.006 miles. (2): Job J7P3391 Route 65 DALLAS County. Resurface from north of Route 32 to north of Ash Street in Buffalo, the total length of improvement being 0.978 miles. (3): Job J7P3449 Route 65 BENTON County. Resurface from south of Route MM to Route AA, the total length of improvement being 8.294 miles. (4): Job J7P3450 Route 54 CAMDEN, HICKORY County. Resurface from west of Route D to 2 miles east of Route BB, the total length of improvement being 8.246 miles. (5): Job J7P3451 Route 65 BENTON County. Resurface on southbound lanes from Route 52 to 0.8 mile north of Route 52 in Benton County, the total length of improvement being 4.281 miles. (6): Job J7P3453 Route 65 BENTON, DALLAS, HICKORY County. Resurface Route AA to north of Route 32 in Dallas County, the total length of improvement being 33.619 miles. Range: 10M to 15M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - G01 - Resurface *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$12,680,000.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
88
Bidding Soon
1,023
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2022

November 15, 2022

Project location map

Multiple Locations, Warsaw, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.