BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and paving for a mixed-use development in Inver Grove Heights, Minnesota. Completed plans call for site work for a playground / park / athletic field; for the demolition of a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

This is a lump sum bid contract for Phase 1 Improvements to South Valley Park. The base bid consists of (3) three lump sum unit amounts as described below. Each unit amount shall include all cost required to complete that portion of the project per the drawings and specification. The three unit amounts shall be added together and included at the end as a bid total that shall cover all the work as described in the plans and specifications. 1. SITE WORK: This lump sum unit amount shall include all site work, including: building and site demo and removals, survey and staking, erosion control, earthworks, sanitary and water utility service to shelter, stormwater utilities, concrete and bituminous paving, curbing, concrete steps and handrail, site electrical, landscaping and site restoration as described in the bid documents. Include all mobilizations, permits, fees, and related items required for a complete job. 2. PARK SHELTER: This lump sum unit amount shall include all architectural, structural, mechanical, shelter electrical, and plumbing items as described in the bid documents. Include all mobilizations, permits, fees, and related items required for a complete job. 3. WELL LINE: This lump sum unit amount shall include all work required to complete the well line work for a complete job as described in the bid documents. Include all mobilizations, permits, fees, and related items required. Direct inquiries to HKGi, Jody Rader at (612) 220-8990 or email jody@hkgi.com. No bidder questions can be addressed after 12:00 pm on Tuesday, January 24, 2023. The City Council will consider award of contract at their regular meeting held at City Hall on February 13 th , 2023, at 6:00 p.m. in the Council Chambers at 150 Barbara Avenue.

Award

Playgrounds / Parks / Athletic Fields

$2,381,104.00

Public - City

Demolition, Paving, Site Work

62

53

13

6

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
45
Bidding Soon
792
All Active Projects
337
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2023

March 28, 2023

img_map_placeholder

2810 70th St E, Inver Grove Heights, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.