BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a library in Summerville, South Carolina. Completed plans call for the construction of a library; and for site work for a library.

Berkeley County is seeking qualified contractors to perform construction of a pavilion at the Sangaree Library located at 595 Sangaree Parkway, Summerville, SC 29486. The local vendor preference for construction projects only applies when the countys estimated project cost is less than $750,000.00. DEADLINE FOR WRITTEN QUESTIONS: September 9, 2022 at 12:00 PM local time Questions may be directed via email to Scott.Maxie@berkeleycountysc.gov BONDS: Bids in excess of $100,000.00 will require a 5% Bid Bond. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. A. Concrete Pad: Construct a 24ft x 60ft concrete pad to act as a base for a covered wooden pavilion i. Excavate & grade surface (currently the area is grass; corners are already staked). ii. Grade, Form, Pour, and Finish concrete slab (roughly 1,450 sq ft). iii. Slab to be 24ft x 60ft x 4" thick with thickended edge footing (see detail on drawing S-1) iv. Minimum of 3,000 psi fiber reinforced concrete over 6 mil polyethelene over termite treated compacted fill. v. Remove all forms, material, and debris from site (to include any concrete from washout area). vi. Finish concrete (plain broom finish) vii. Saw cut joints at 12ft x 12ft per industry standard (1/8" wide x 1" deep). B. Pavilion: Construct a 24ft x 60ft covered pavilion with a gable-style standing seam metal roof. (Drawings provided) i. Framing: 1. Treated 8x8 vertical posts. 2. Vertical posts to be installed as noted on the plans for both location and height/depth. 3. Pre-engineered scissor trusses (3:12 slope top chord) to be used. Install as noted on plans. 4. All noted Simpson strong ties and brackets must be installed per plans. 5. Note there are to be 12" open rafter design ii. Roofing: 1. Metal standing seam roof to be installed over the engineered trusses as defined in the plans provided. 2. Metal roofing exact color to be approved by owner; please provide color samples in the range of Forest Green or Dark Green 3. ADDITIONAL REQUIREMENTS: a) Contractor is responsible for providing all material and labor. b) Contractors allowed to work Monday-Sunday. c) Power and water source is unavailable at the project location.

Award

Library

$54,710.00

Public - County

New Construction, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
62
Bidding Soon
712
All Active Projects
351
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2022

October 20, 2022

img_map_placeholder

595 Sangaree Pkwy, Summerville, SC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.