BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Round Rock, Texas. Completed plans call for the renovation of a water / sewer project.

INTRODUCTION: The City of Round Rock, herein after “the City” seeks a bid from firms experienced in glazing and storefront window removal and installation. The City’s water treatment plant, Phase 3 and 4 buildings, require complete replacement of all windows and storefront windows. 2. GLAZING AND STOREFRONT WINDOWS: A. Contractor shall provide all labor, supplies, equipment, and materials required to satisfactorily remove and reinstall all glazing and storefront. B. Storefront will include removal and replacement of doors and hardware. C. All materials shall be in new and unused condition unless otherwise agreed upon by the City. D. A list of materials and manufacturers shall be provided to the City POC for approval prior to any work being performed. E. All materials and installations shall be in accordance with Attachment E – Phase 3 Door and Window Schedules, Attachment F – Phase 3 Elevations, Attachment G – Phase 4 Door and Window Schedules, and Attachment H – Phase 4 Elevations. F. All glass shall be tinted or transitional with Ultraviolet (UV) blocking capabilities preferred. G. All waterproofing must be removed and reinstalled. H. A water test shall be performed on all windows and storefront at the completion of the project with a City representative present. If there are any failures, the contractor shall be responsible for immediate repairs. 3. SERVICE REQUIREMENTS: A. Services shall be performed at the following location: Water Treatment Plant (Phase 3 and Phase 4) 5200 N IH 35 Round Rock, Texas 78665 B. The Contractor shall be responsible for all inspections and permits that may be required for the completion of this project. C. Services shall be performed during normal business hours 7:00AM – 5:00PM unless otherwise agreed upon by the City POC. D. Successful Respondent shall provide at minimum a one (1) year warranty on all workmanship and parts including but not limited to manufacturer's warranty, workmanship defects, and installation. All warranty work shall be completed within five (5) working days from notice of defect.

Post-Bid

Water / Sewer

$200,000.00

Public - City

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
30
Bidding Soon
2,187
All Active Projects
835
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2022

October 24, 2022

img_map_placeholder

5200 N Interstate Hwy 35, Round Rock, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.