BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Torrington, Connecticut. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The project work is comprised of furnishing all equipment, labor, material, plant, and superintendence to perform all work necessary for the construction of new concrete sidewalks and curbing including, driveway aprons, catch basin tops, traffic signal modifications and associated miscellaneous work. A bid bond, in an amount not less than five percent (5%) of the amount of the bid shall accompany each bid with a performance bond and a labor & materials bond. A non-collusion statement for Prime Contractors and any addendum acknowledgement must also be submitted at the time of the bid. The City of Torrington reserves the right to accept or reject any or all bids, to waive technicalities, or to award the contract to a bidder other than the lowest bid, and to award the contract as it feels will best serve the public interest. The contractor who is selected to perform this State project must comply with CONN. GEN. STAT. 4a-60, 4a-60a, 4a-60g, and 46a-68b through 46a-68f, inclusive, as amended by June 2015 Special Session Public Act 15-5. State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification from the Connecticut Department of Administrative Services under the provisions of CONN. GEN STAT. 4a-60g, as amended. (25% of the work with DAS certified Small and Minority owned businesses and 25% of that work with DAS certified Minority, Women and/or Disabled owned businesses.) The contractor must demonstrate good faith effort to meet the 25% set-aside goals. For municipal public works contracts and quasi-public agency projects, the contractor must file a written or electronic non-discrimination certification with the Commission on Human Rights and Opportunities. All bids will be considered valid for a period of sixty (60) days. Question Deadline 09/02/2022 at 12:55 PM ET All questions shall be submitted in writing.

Award

Sidewalks / Parking Lot

$768,626.00

Public - City

Paving, Site Work

66

13

4

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
421
Active Projects
242
Bidding Soon
3,809
All Active Projects
1,623
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2022

October 13, 2022

img_map_placeholder

202 E Main St, Torrington, CT


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.