BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2024 at 8:00 PM

Updated August 8, 2024

This is a service / maintenance or supply contract in Winston Salem, North Carolina. Contact the soliciting agency for additional information.

This project provides funding to implement recommendations provided from the structural assessment of Idols Dam. The low head dam at Idols was originally built in 1898 and since its original construction has not had any significant maintenance or repair work completed. This dam and associated infrastructure are essential to maintain a sufficient pool of water for the three 50 MGD pumps in the Idols Raw Water Pump Station that supplies approximately 70% of Winston-Salem/Forsyth County Utilities water. As of August 7, 2024, this project is included City of Winston-Salem FY 2024-2029 CIP. No further information regarding a design firm has been made available. A detailed timeline for construction has not yet been established. The Winston-Salem/Forsyth County Utilities owns and operates the historic Idols Dam which is located on the Yadkin River between Davie and Forsyth Counties. Idols Dam maintains an upstream pool level adequate for the Idols pump station water supply intake located approximately 300- feet upstream of the dam. The dam was built over 100 years ago and needs rehabilitation. The tailrace downstream of the Obermeyer gates and the main channel of the river behind the dam are separated by a masonry and concrete retaining wall that has failed in some sections. These walls also have multiple visible cracks, spalls, and offsets. The selected engineering firm will provide assessment, documentation, and recommendations for the structural integrity of the dam, concrete and masonry walls of the tailrace, and all associated structures. Due to Idols Dam being a historic structure, additional permitting and coordination may be required. The method of contractor selection has not been determined at this time

Conceptual

Water / Sewer

$12,500,000.00

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
140
Bidding Soon
1,755
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

Project location map

To Be Determined, Winston Salem, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.