Site work and paving for a civil project in Crystal River, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

City of Crystal River, Florida ("City") invites interested parties to submit a Bid to provide roadway resurfacing services for various roadways throughout City of Crystal River. The work includes, but is not limited to, furnishing all equipment, labor, and material for resurfacing all listed streets with some limited pre-milling consists of placing an average of 1", depending on condition of the road, turnout, or intersections as determined by the City, of FC-9.5 (Fine) per FDOT Section 334. The asphalt to be provided for the project shall be FDOT pre-approved and identified on the current FDOT Asphalt Mix Design Plant Assignment Sheet. WORK INCLUDES: but is not limited to, cleaning of all pavement, including exposing and cleaning edge of existing pavement, milling, paving approximately 7 miles of roadway, temporary and permanent pavement markings, installing new R.P.M.s, (reflective permanent markers) shoulder grading, sodding, the installing of stop bars, cross-walks, yellow double-center line painting, manhole and water valve riser rings, and variously located road repairs as specified in the Contract Documents for in City of Crystal River, Florida. Traffic control, mobilization, tack coat, and removal of edge of pavement debris shall be included in the tonnage price of asphalt. Contractor is responsible for providing positive drainage away from the roadway surface Bids must be accompanied by a Bid Security made payable to City of Crystal River, Florida, in an amount of five percent (5%) of the Bidder's Bid Price in the form of a certified or cashiers check or a Bid Bond. Successful Bidder shall commence work within 90 days from Notice to Proceed. Once work begins, Contractor must be substantially completed within one hundred and twenty (150) days and all work must be completed within one hundred and fifty (180) days from start-up. City and Successful Bidder recognize that time is of the essence of this Agreement and that City will suffer financial loss if the Work is not completed within the times, or by the dates, specified in the Agreement, plus any extensions. They also recognize the delays, expense and difficulties involved in proving in a legal preceding the actual loss suffered by City if the Work is not completed on time. Accordingly, instead of requiring any such proof, City and Successful Bidder agree that as liquidated damages for delay (but not as a penalty), Successful Bidder shall pay City Five hundred dollars, ($500.00) for each day beyond the Final Completion date and the Substantial Completion liquidated damage value shall be one-quarter (1/4) of the calculated liquidated damage value for each day beyond the Substantial Completion date, and for each day that expires beyond the time specified (readiness for final payment). Sundays and legal holidays shall be excluded in determining days in default. The City reserves the right to add or delete roads and/or quantities as deemed necessary. Deadline for Questions November 10th 5:00 pm

Award

Roads / Highways

$1,229,741.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
50
Bidding Soon
834
All Active Projects
368
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2022

January 17, 2023

img_map_placeholder

Multiple Locations, Crystal River, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.