BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in San Antonio, Texas. Working plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Project canceled C. Abbreviated Written Summary: Briefly, and without effect upon Contract Documents, Work of Contract can by summarized as follows: 1. The Work includes but is not limited to: Site Development of earthwork, fill, drainage structures, site concrete constructions, utilities, fencing and landscaping in preparation for the construction of the Baseball and Softball Fields. 2. Supply all labor, materials, transportation, apparatus, light, scaffolding, tools and do everything necessary for the entire proper execution and completion of the Work. Install, maintain and remove all equipment of construction and other tools, and be responsible for the safe, proper and lawful maintenance and use of same. Construct this Project in the best and most workmanlike manner and do everything properly incidental thereto as shown on the Drawings, stated in the Specifications or reasonably implied there from, and in accordance with the Contract Documents. The Drawings include Civil, Landscape, Architectural, Electrical, and Security Work. D. Secure all permits, fees and licenses required for the proper execution and completion of the Work. E. Give required notices. F. Comply with codes, ordinances, rules, orders and other legal requirements of public authorities, which bear on performance of the Work. G. Enforce strict discipline and good order among employees. Do not employ on the Work persons who are unfit or unskilled in assigned task. The construction of a baseball and a softball fields along with site utilities, sidewalks, dugouts, bleachers and accessories. Questions Due Date: Sep 7th 2022, 12:00 PM CDT The estimated construction budget is $6,400,000.00 which includes a $600,000.00 contingency.

Final Planning

Playgrounds / Parks / Athletic Fields

$6,884,000.00

Public - City

Paving, Site Work

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
25
Bidding Soon
1,891
All Active Projects
743
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.