BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Santa Fe, New Mexico. Completed plans call for the construction of a 2,500-square-foot municipal facility; for site work for a municipal facility; 1,200-square-foot warehouse / distribution facility; and warehouse / distribution facility.

The Pueblo of Tesuque Utility Authority is seeking Requests for Proposals for design and build of public space that contains a minimum 2,500sf feet of office space and a minimum of 1,200sf of warehouse space. The complex must integrate green building components and contain Pueblo architecture elements. Section I. SCOPE OF WORK (SOW) The Pueblo of Tesuque is looking for a contractor to design a multi-purpose building with sustainable elements and LEED certification for the UA to operate out of. The design and build must include: 1. A minimum of 2,500sf of space to house staff. 2. A minimum of 1,200sf for equipment and tool storage. 3. A front reception/welcoming area open to the public. 4. A private area adjacent to the welcoming area that will allow customers to discuss service and billing issues with staff. 5. Offices for up to 10 staff, with some office space being coworking or similar. 6. Small conference room for up to 10 people. 7. Larger conference/training room for 30 people. 8. Communal kitchen and eating area. 9. Computer/GIS lab room. 10. Water sampling lab room. 11. Public restrooms. 12. Shower, laundry, and locker facilities for staff. 13. Storage and housecleaning closets. 14. Architectural design elements that incorporate features of public utilities with a strong focus on water conservation and resource sustainability. 15. Architectural design elements that incorporate Pueblo design and culture. 16. Weather protected outdoor working, seating, and eating areas. 17. Secure storage for heavy equipment, vehicles, materials, etc. 18. Equipment wash bay. 19. Complies with all applicable State of New Mexico building and construction codes, including electrical, fire, and plumbing codes, and any other codes adopted by the UA. 20. Architect designed and engineered stamped drawings. PROJECT SCHEDULE The Utility Authority would like work to commence as early as October 2022 and conclude by April 2023. Proposals shall include a project timetable by task, with a timeline for completion of the scope of services for the project.

Post-Bid

Municipal

$560,000.00

Public - Federal

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
18
Bidding Soon
345
All Active Projects
148
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 30, 2022

October 19, 2022

img_map_placeholder

To Be Determined, Santa Fe, NM


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.