BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 2, 2022 at 8:00 PM

Updated January 26, 2024

Renovation of a fire / police facility in Palm Springs, California. Completed plans call for the renovation of a fire / police facility.

As of Noveber 2, 2022, project was awarded toR.E. Chaffee Construction, Inc., awarded amount is $103,438.51. City of Palms Springs is soliciting bids from qualified bidders for Basement Sewage Pump System The City of Palm Springs is requesting Bids from licensed and qualified firms for a new basement sewage pump system at the City of Palm Springs Police Department Question Deadline 09/01/2022 at 5:00 PM PT All questions are to be submitted through PlanetBids vendor portal. Responses to Requests for Clarification will be posted via Addendum September 6, 2022 1. Remove and dispose of both pumps, the basin cover, the control panel, and the mechanical level controls 2. Install two new 3 HP/460 VAC/3(/J submersible cutter pumps 3. Install two guide rail systems (one for each pump), each includes: Base elbow, pump adapter/claw, upper guide rail bracket, sch. 40 316 stainless steel guide rails, 316SS pump pull chain, 316SS anchoring hardware 4. Install two new 3" check valves, epoxy lined/coated with resilient disc. 5. Install two new 3" bronze gate valves 6. Install new 3" discharge piping to connect the new pumps and valves to the existing discharge piping. Piping in the sump to be sch. 80 PVC, sch. 40 316SS through the cover and no-hub cast iron above the cover. Piping in the sump to return a small amount of water being pumped into the sump to help break up debris accumulated at the surface of the water 7. Install one new hot dipped galvanized steel hatch cover; to be connected to the existing waste vent; to include liquid-tite flexible conduit to protect the pump and float cords above the hatch cover 8. Install one new Duplex Pump System Control Panel with the following features: NEMA 1 steel enclosure, power disconnects, magnetic motor contactors, motor overcurrent protection, H-O-A (Hand-Off-Auto.) switches, ETM's (Elapsed Time Meters), pump run pilot lights, control xfmr, automatic pump alternation, audible high water alarm with silencer, auxiliary dry contacts (for control power loss, 'lag' pump call, high water) 9. Install four new non-mercury heavy duty float switches complete with a float anchor assembly with 316SSI chain, shackles, cable clips, and eyebolt 10. Provide Vacuum Tanker Truck to remove the debris from the sump 11. Perform Confined Space Entry as required by OSHA, includes One Entrant, one Attendant, Safety Equipment 12. Test the system for proper operation upon completion 13. Make the necessary arrangements in advance to have no inflow into the sump for the duration of this work

Award

Fire / Police

$101,696.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
291
Active Projects
136
Bidding Soon
1,772
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2022

October 13, 2022

Project location map

200 S Civic Dr, Palm Springs, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.