BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a service station / car wash facility in Branson, Missouri. Completed plans call for site work for a service station / car wash facility.

As of October 31,2022,this project has not yet been awarded. A timeline for award has not yet been established. 1. Purpose: The City of Branson, Missouri ("City") is accepting sealed proposals from qualified business entities for the installation, operation, maintenance, and management of self-service Electric Vehicle (EV) Charging Stations at locations yet to be determined within the City. The City of Branson is a 4th class municipality located in Taney County. The City serves a population of approximately 12,000 residents and has approximately 8 million visitors annually. The City seeks to mitigate as much up-front and ongoing costs as possible to its taxpayers. Revenue sharing models are welcomed, but not required. Revenue sharing and billing will be handled by the chosen vendor or vendor-affiliate. Vendors will provide details via their proposal on how fees are collected from the end-user and the portion of those fees allocated to the City. The City prefers full turn-key solutions. Vendors will provide all associated costs via their proposal, including the purchase or lease of hardware, software, installation, ongoing hosting, warranty, ongoing operation, maintenance, and any and all costs associated with the project. The City seeks to understand not only the short-term cost of the project to install, but also accurate future costs related to the ongoing functionality of the level-2 and level-3 charging stations. Level-3 charging stations are strongly preferred. Costs incurred in the development of proposals are solely those of the vendor. If the Proposer proposes charging the public for use of electricity and the charging stations, the EV chargers must allow for point-of-sale transactions and provide for revenue remittance to the City. Contractor also clearly describes the cost of energy per kWh, how that price is calculated, and how it changes over time, and this shall be included in the Cost and Revenue Proposal. The City is not a subject matter expert in this emerging technology and seeks to partner that will provide strong support throughout the installation and ongoing maintenance of the selected charging stations. Evidence of municipally installed and managed projects is preferred. Vendors will provide details via their proposal on how technical support and maintenance will be addressed. The City will consider all models of level 2 and level 3 charging stations and software packages, as long as hardware is cold-weather climate compatible and software is fully supported by the vendor or third-party provider. The chosen vendor will be selected in-part based on availability of hardware, software, and ability to complete the project within a reasonable timeframe. The City has not determined locations for the placement of charging stations. Contractor shall be responsible for performing a due diligence and investigation of the proposed locations and must also determine the suitability or non-suitability of each proposed site. The City will coordinate with selected vendor to identify the best locations for charging stations. Contractor shall furnish and install all materials, equipment, and labor required for the installation of the EV charging station(s). The Contractor is also responsible for securing all related permits and coordinating with the utility companies. Following the installation, the Contractor shall activate and test the EV charging station(s) and will be responsible for the safe operation of all equipment and connections. Proposer must clearly state the methodology for the chosen locations to pursue the installation of the charging station.

Post-Bid

Service Station / Car Wash

$30,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
27
Bidding Soon
356
All Active Projects
143
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2022

October 20, 2022

img_map_placeholder

Multiple Locations, Branson, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.