Renovation of a military facility in Philadelphia, Pennsylvania. Completed plans call for the renovation of a 8,000-square-foot military facility.

Award Details Contract Award Date: Sep 14, 2022 Contract Award Number: N4008520D0163 Task/Delivery Order Number: N4008522F6351 Contractor Awarded Unique Entity ID: DQEWGZCLS7A7 Contractor Awarded Name: Oakmont Contracting LLC Contractor Awarded Address: Baltimore, MD 21230-2075 USA Base and All Options Value (Total Contract Value): $7159311.00 All terms and conditions of N4008520D0157/0158/0159/0160/0161/0162/0163/N4008521D0010 Indefinite Delivery Quantity Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. You are responsible to adhere to all applicable clauses, even if they are not stated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issues, please contact Brittany Cristelli at brittany.n.cristelli.civ@us.navy.mil. Amendments will be posted directly to www.sam.gov. NAVFAC Solicitation No.: N40085-22-R-2770 NAVFAC Specification/Drawings: Work Order No. 1678624 (Attachments A & B) Title: Building 77L Secure Room Repairs Location of the Work: NSWC in Philadelphia, Pennsylvania Description of the Work: This project converts various existing offices and one conference room located in 77L into secures paces to support classified work activities for Naval Surface Warfare Center Philadelphia (NSWC) at Philadelphia Navy Yard Annex (PNYA). The total space area included in this project is approximately 8,000-square feet. Estimated Price Range: In accordance with FAR 36.204(g), the magnitude of construction for this project is between $5,000,000 and $10,000,000. Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the duration of this task order shall be 555 calendar days from date of award (includes 15 calendar days for submission and approval of bonds and insurance). Wage Determination: Department of Labor (DoL) General Decision Number PA20220003 applies to this work (Attachment C). The wage determination version in effect at the time of award shall apply to the work performed under this contract. Liquidated Damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,580 for each calendar day of delay until the work is completed or accepted. Utilities: In accordance with FAR 52.236-14 Availability and Use of Utility Services - The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge. Record Shop Drawings: In accordance with FAR 52.236.21 Specifications and Drawings for Construction, record shop drawings are required. Reproducible copies of these record drawings are not required. Government Furnished Property: Not included. Basis for Award: This task order will be awarded on a fair opportunity basis pursuant to FAR 16.505 ordering procedures. The proposed task order will be awarded to the responsible Offeror, offering the best value to the Government. For this task order, to make a determination of best value, the Government shall evaluate each Offeror on price only and the basis for award will be low price. Bond Requirements: In accordance with FAR 52.228-1, Bid Guarantees, each Offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or $3,000,000, whichever is less. The Offeror shall submit an electronic copy with the price proposal form and a hard copy of your bid bond must be submitted to the address listed in the title above, within three (3) days after the due date and time for receipt of proposals. Failure to submit a bid bond by the deadline will result in your proposal being removed from consideration. Performance and Payment Bonds are required from the contract task order awardee ten (10) calendar days after date of award. Proposal Acceptance Period: Proposal acceptance period shall be 120 days from receipt of offers. Pre-Proposal Inquiries (PPIs): Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. All inquiries shall be submitted via email to Rachel Honecker at brittany.n.cristelli.civ@us.navy.mil no later than 10 days prior to the proposal due date. Additionally, all inquiries shall be submitted using the Pre-Proposal Inquiry (PPI) form (Attachment D). Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. Responses will be published via amendments to www.sam.gov. Site Visit: Site Visit: Only ONE Government sponsored site visit will be held for this solicitation. The site visit will be held on Tuesday, 02 August 2022 at 10:00 a.m. EDT. Work under this contract is restricted to U.S. Citizens. Attendees shall meet at the main entrance of Building 77L (1000 Kitty Hawk Avenue, Philadelphia, PA 19112) at 9:45 AM with a proof of U.S. Citizenship. Documents acceptable for Proof of Citizenship are listed in Specification Section 01 14 00, Paragraph 1.3.1.2.1. Visitors without proof of citizenship will be denied entrance. All attendees shall e-mail Glenn Ismael at glenn.r.ismael.civ@us.navy.mil in order to coordinate escorts. Provide name, company name, email address and phone number of the attendee. Access will be rejected if sufficient escorts are not obtained. Proposal Due Date: Monday, 29 August 2022 at 1400 Eastern Daylight Time. LATE PROPOSALS WILL NOT BE ACCEPTED. Proposal Delivery Information: OFFERORS SHALL SUBMIT electronic proposals (.pdf format) in response to this solicitation using the PIEE Solicitation Module. Only the PIEE Solicitation Module is authorized for the submission of electronic proposals in response to this solicitation. Electronic proposal submissions should be no larger than 1.9 GB per file. Offerors shall ensure that the Government has received the electronic proposal prior to the date and time specified. PIEE Solicitation Vendor Access Instructions are provided via Attachment F. Emailed submissions will not be accepted. Offerors shall allow adequate time to upload files which may be slower for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in the format specified and consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened, or are otherwise missing the required content are the responsibility of the Offeror. PIEE system will record the date and time of package submittal. The date and time of package submittal recorded in PIEE shall govern the timeliness of any proposal submission. LATE PROPOSALS WILL NOT BE CONSIDERED. In response to this request for proposal, the complete proposal shall include the Price Proposal and the Non-Cost/Price Factors Proposal, submitted in accordance with the above Basis of Evaluation and Submittal Requirements for Each Factor. Evaluation Factors for Award 1. The proposed task order will be awarded to the responsible Offeror offering the best value to the Government. The lowest price source selection process is selected as appropriate for this acquisition because the best value is expected to result from selection of the proposal with the lowest evaluated price. To make a determination of best value, the Government shall evaluate each Offeror on price only. 2. Basis of Evaluation and Submittal Requirements for Each Factor. (a) Price: (1) Solicitation Submittal Requirements: Offeror shall submit the following: Cover page that includes: - Solicitation Number - Solicitation Title - Prime Contractor Name - Prime Contractor Address - Phone Number - Fax Number - Unique Entity ID - Cage Code - Point of Contact - Point of Contact Phone Number - Point of Contact Email Price Proposal Form (Attachment E) Acknowledged Amendments (if applicable) Bid Bond (2) Basis of Evaluation: The Government will evaluate price based on the lump sum price. The Government will evaluate price based on the total price proposal including the base price and all options. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price: a. Comparison of proposed prices received in response to the RFP. b. Comparison of proposed prices with the Independent Government Cost Estimate (IGCE). Page 5 of 25 c. Comparison of proposed prices with available historical information. d. Comparison of proposed prices with market survey results. Evaluation 1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the Offeror submitting the lowest price proposal. 2. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The intent of this project is to renovate two specific areas within Building 77L to provide new secure office suites for NSWC use and occupancy. The work includes the demolition of these areas and the reconstruction of the work spaces as indicated on the plans and in the specifications.

Award

Military

$7,159,311.00

Public - Federal

Renovation

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Installer Qualifications, Field Samples, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Lead Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Support Assemblies, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings, Metal Gratings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Sheathing, Underlayment, Finish Carpentry, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Vapor Retarders, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Composite Roof Panels, Composite Wall Panels, Siding, Roof and Wall Specialties and Accessories, Roof Accessories, Roof Walkways, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Access Flooring, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Storage Specialties, Lockers, Exterior Specialties, Protective Covers, Other Specialties, Scales
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Commercial Equipment, Office Equipment, Computers
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Rugs and Mats, Runners, Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks, Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Radiators, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Obstruction Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Clamps, Hooks, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment, Packaged Water Treatment, Packaged Water Treatment Plants

Find More Local Projects

Within 75 Miles of This Project
421
Active Projects
223
Bidding Soon
3,770
All Active Projects
1,827
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2022

October 28, 2022

img_map_placeholder

5001 S Broad St, Philadelphia, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Building 77L Secure Room Repairs

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.