BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Elizabeth, Illinois. Working plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

**As of January 27, 2023, no bids received. As of this time it is unknown when project will rebid.** The work for which bids are asked includes the following: Improvements to Well house #1 to include building interior and exterior improvements including; removal and replacement of existing roof with pitched aluminium roof, removal and replacement of fascia, installation of gutters and downspouts, removal and replacement of four exterior windows, installation of an interior partition wall, tuck-pointing, and foundation repair. Well improvements include pulling and replacing the 40hp submersible well pump, motor, and 4-inch epoxy coated column piping, removal and replacement of well process piping, valves, meter, and appurtenances, installation of chemical containment and replacement of chemical drum scales with radar measurement. Electrical improvements include removal and relocation of electrical controls from lower level to upper level, temporary power and SCADA set-up, updating PLC, replacement of lighting panels, replacement of transformer, addition of pressure transducer with selector switch and programming at Well 2, safe generator connection to run controls, new UPS, with all associated programming and system integration. The anticipated substantial completion date is October 1, 2023 and final completion date is November 1, 2023. "The contractor shall pay prevailing wages in accordance with the Federal Davis Bacon wages provision. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the contract documents must be paid on this project, and that the contractor must ensure that employees and applicants for employment are not discriminated against because of race, colour, religion, sex or national origin. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 90 calendar days after the actual date of the opening thereof. Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a loan from the Illinois Environmental Protection Agency (Illinois EPA). Neither the State of Illinois nor any of its departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. The procurement will be subject to regulations contained in the Procedures for Issuing Loans from the Public Water Supply Loan Program (35IAC Part 662), the Davis-Bacon Act (40 USC 276a through 276a-5) as defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570), IL Works Jobs Program Act Apprenticeship Initiative, and the federal "Build America, Buy America Act" requirements contained in the Infrastructure Investment and Jobs Act, Pub. L. No. 117-58. This procurement is also subject to the loan recipient's policy regarding the increased use of disadvantaged business enterprises (DBEs). The loan recipient's policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. The policy is contained in the specifications. Bidders are also required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in 41 CFR 60-4. Minimum salaries and fringe benefits paid on the Contract shall be in accordance with the prevailing wage rate scale established by the United States Department of Labour and the Illinois Department of Labour, such wage rate determinations are included in the Contract Documents. The minimum wages to be paid on the project shall be the higher of the wage scale established by either the Federal or State wage rates. Attention is called to the fact that the Contractor must ensure employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. Federal Davis Bacon Wage Rates: Federal wage rates can be found at website. Be aware that project Administrators, Bidders, and Contractors are required to use the latest federal wage rate available at the time of bid opening. A conditional or qualified BID will not be accepted. Award will be made to the low, responsive, responsible BIDDER. OWNER reserves the right to waive any informalities or to reject any or all bids.

Final Planning

Water / Sewer

$400,000.00

Public - City

Renovation, Site Work

20

20

8

12

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
39
Bidding Soon
711
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2022

July 27, 2023

img_map_placeholder

Park St, Elizabeth, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.