BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Virginia Beach, Virginia. Completed plans call for site work for a water / sewer project.

Award Details Contract Award Date: Sep 09, 2022 Contract Award Number: H92240-22-P-0073 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: VCKJENLJHB65 Contractor Awarded Name: BAY ENVIRONMENTAL INC Contractor Awarded Address: Chesapeake, VA 23320-5206 USA Base and All Options Value (Total Contract Value): $45315.75 BACKGROUND 1.1 SBT-20 requires a larger tank for wash rack bilge pump purposes. 2. OBJECTIVES 2.1 The objective of this requirement is to have installation of one 500 gallon above ground tank to drain bilges of CCAs, CCMs, and CCH while conducting wash rack operations. 3. SCOPE 3.1 The Contractor shall provide the personnel, management, materials, equipment, and facilities (not otherwise provided by the Government) necessary to deliver and install the tank, pump, and hoses according to the manufacturers and EPA guidelines. 4. REQUIREMENTS 4.1 The Contractor shall provide and deliver the following material/equipment: 4.1.1 500 Gallon rectangular "S Style" double wall UL-142 aboveground tank measuring at: Width: 4'3" Height: 2'9" Length: 6'2". Tank shall have 6" fitting on top of tank and 2" fitting in the head of tank. Tank shall be made of mild carbon steel and coated with Epoxy primer/Urethane Topcoat-SP-6 Blast (White). 4.1.2 Tank Monitoring Equipment shall include AA Single Channel Battery Powered Alarm Box and a 6" Stainless Steel Adjustable Level Sensor. 4.1.3 Tank Equipment shall include OPW 61fSTOP-2000 2" X 4" Overfill Prevention Valve, 2" Swing Check Valve, OEM 14025 2" Mushroom Vent, 4" 8 oz. Emergency Vent Male Thread, 2" Full Port Locking Ball Valve, 2" Direct Read Clock Gauge, Rectangular Tank Gallon Dial Face, 6BPL 6" Black Plug, Decal Package, Painted Pump and Hose Reel Stands, Miscellaneous Pipe and Fittings, and Electrical Supplies. 4.1.4 Pump and Hose accessories shall include 23FA-EC Pump, 2HP 1/60/110V Motor, Starter Control Panel, 50 Feet 2" Suction Hose EPDM and Probe, EPJ8234-26-27 Suction/Discharge Reel, 115V Electric Rewind Reel with Junction Box and EP Switch, and Inlet Swivel with Viton Seals. 4.2 The Contractor shall install the above stated material/equipment according to the manufacturers and EPA guidelines. All material/equipment shall be fully functional upon completion of installation. 5. DELIVERABLES: N/A 6. CONTRACTOR TRAVEL 6.1 All travel costs associated with this requirement shall be included in the Firm-Fixed Price quotation for this requirement. Contractor will not be reimbursed separately for travel Submission Requirements: (1) The Government intends to issue an award to the offeror whose quote represents the lowest priced technically acceptable (LPTA) quote. LPTA is defined as submission of a quote that complies with all terms and conditions contained within the Request for Quote (RFQ) AND that is lowest priced. Lowest price is determined by the Total Evaluated Price of all Contract Line Item Numbers (CLINs). (2) Quote Format And Content. Electronic quotes shall address the sections listed below. Individual emails may not exceed 10 MB. Submissions with .zip files are not acceptable and will not be delivered by the Government email server. The Government server does not generate rejection notices and it may not forward a file if quarantined by the edge device. As such it is the vendor's responsibility to ensure its quote is received. Offerors may submit multiple emails in submitting a complete quote. In submitting emails, Offerors shall disclose the total number of emails and addendums associated with the full quote. Type shall not be less than 10 pitch. (3) Question Submission: Offerors may submit written questions during the quote preparation period. All questions must be received no later than 05:00 PM EDT on 23 August 2022 to allow adequate time to prepare and issue responses prior to the date and time set for receipt of quotes. Questions received after this date run the risk of not being answered. Only written questions will receive a response. It is required that each question should include the document name, document date, specific page, paragraph, clause or other definitive citation requiring clarification. Email is the only acceptable method of submission. (4) Quote Submission: All quotes shall be submitted no later than the time indicated on the Request for Quote (SF-1449) document. If Amendments are issued, quotes shall be submitted by the date indicated on the Solicitation Amendment. Quotes and questions shall be emailed to holly.l.deignan.civ@socom.mil with the following in the subject line: QUOTE FOR H92240-22-T-0036 Wash Rack Bilge Waste Tank Install. Contractors are responsible for verifying receipt of their quotes to the identified inbox before the specified due date and time. Contractors are advised to plan ahead, ensuring enough time to account for any potential delays in email transmission. An E-mail quote that resides on a Government server, but has not appeared in the designated E-mail inbox by the due date and time for quote submission will be considered late in accordance with FAR 15.208(b). Email file size shall be limited to 10 MB. If documents exceed 10 MB, vendors shall submit documents via separate emails to ensure each email is no more than 10 MB. Email is the only acceptable method of submission. *It is incumbent upon the Offeror to ensure that its entire quote is received by the Agency by the designated due date. (5) Comprehensive responses to the requirements of this Request for Quote (RFQ) are required to enable the Government to evaluate the Offeror's understanding of, capability and approaches to accomplish the stated requirements. Quotes shall be submitted in accordance with the instructions herein, and non-conformance with the specified required content may be cause for rejection of the quote. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale in their quote. Any such exceptions or failure to identify exceptions may render the quote ineligible for award. The quote shall be valid for no less than 60 days from the date of RFQ closing. The quote shall provide comprehensive responses to the areas provided for in this section. The successful offeror will be selected based on an evaluation of quotes as outlined in FAR 52.212-2 and it's addendum, included in this RFQ.

Award

Water / Sewer

$45,316.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
51
Bidding Soon
958
All Active Projects
447
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 31, 2022

September 15, 2022

January 15, 2023

img_map_placeholder

To Be Determined, Virginia Beach, VA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.