Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 13, 2022 at 8:00 PM
Updated September 15, 2023
Demolition, site work, renovation and addition to a fire / police facility in Orange, California. Design plans call for the addition of a fire / police facility; for the renovation of a fire / police facility; for site work for a fire / police facility; and for the demolition of a fire / police facility.
The Fire Department is looking to replace two existing structures to the rear of Fire Station 3 with one new building that will include: additional space for apparatus storage, a workshop, laundry room, and a room for medical and disaster supplies. Fire Station 3 was built in 1962 and currently has a barn and concrete masonry building that are located in the rear parking lot of the property. These two buildings are used for the outfitting of emergency apparatus with tools and equipment, station laundry, and medical supply storage. Due to the age and deterioration of these two buildings, building a new structure will provide the necessary space to meet the operational needs of the department for many years to come. The existing fire station will remain unchanged. The estimated cost of this project is $2,675,000, per cost estimate provided by WLC Architects. Project Type: One-Time Starting Fiscal Year: 2021-2022 Estimated Completion Date: June 2024 Funding Source(s): Capital Projects; Fire Facility Fee Districts All Com 6/07 Project is included in the City of Orange's FY 2022-23 Budget CIP. As of September 13, 2022, an architect has been identified. A timeline for construction has not been determined, however project is anticipated to be completed in June 2024.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Fire / Police
$2,675,000.00
Public - City
Addition, Demolition, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
