Published December 9, 2025 at 7:00 PM

Updated December 18, 2025

Demolition, site work and new construction of a mixed-use development in Lockport, Kentucky. Completed plans call for site work for a power facility; power facility; and for the demolition of a water / sewer project.

As of December 09, 2025, this project has not yet been awarded. A timeline for award has not yet been established. The BASE BID Work shall include demolition of the existing Upper Guide Walls at both Kentucky River Locks 2 and 3 and the construction of new Upper Guide Walls consisting of sheet pile walls with tie-back anchors. These sheet pile retaining walls will be constructed along the same baseline as the current guide walls upstream from the lock chambers as shown on the Drawings. The BASE BID Work will also consist of site preparation, erosion and sedimentation control with fluctuating river levels, construction access, selective demolition, dredging, earthwork, constructing tie-ins to existing lock features, slope construction and protection, temporary shoring, drainage improvements, and site grading and restoration work. Demolition work at Lock 2 shall include the Upper Guide Wall and Upper Guide Wall Extension. The replacement Upper Guide Wall at Lock 2 will feature a tie-back anchor system to stabilize the new Upper Guide Wall and the adjacent slope up to state route KY-389. This anchor system will include an earth-retaining sheet pile wall at the base of the slope with tie-backs anchored into the bedrock. A Contractor designed temporary bracing and/or monitoring system is required. The construction will also include a concrete sidewalk with mooring pins along the edge of the newly constructed guide wall, earthwork and slope regrading, and stone slope protection. Demolition work at Lock 3 shall include the Upper Guide Wall. The replacement Upper Guide Wall at Lock 3 will feature a tie-back anchor system to stabilize the new Upper Guide Wall. This anchor system will include an earth-retaining sheet pile wall at the base of the slope with tie-backs anchored into a sheet pile anchor wall. The construction will also include a concrete sidewalk with mooring pins along the edge of the newly constructed guide wall, earthwork and slope regrading, and drainage improvements. Additional questions will be accepted until September 16, 2025.

Bid Results

Water / Sewer

$11,223,000.00

Public - State/Provincial

Demolition, New Construction, Site Work

61

14

28

12

Subscribe For Documents

70 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
299
Active Projects
163
Bidding Soon
1,704
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2025

December 16, 2025

Project location map

KY-389, Lockport, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.