Demolition and site work for a mixed-use development in Lockport, Kentucky. Completed plans call for site work for a power facility; power facility; and for the demolition of a water / sewer project.

ENGINEERING FILE NO. 084-C9QS-RA13-00 The BASE BID Work shall include demolition of the existing Upper Guide Walls at both Kentucky River Locks 2 and 3 and the construction of new Upper Guide Walls consisting of sheet pile walls with tie-back anchors. These sheet pile retaining walls will be constructed along the same baseline as the current guide walls upstream from the lock chambers as shown on the Drawings. The BASE BID Work will also consist of site preparation, erosion and sedimentation control with fluctuating river levels, construction access, selective demolition, dredging, earthwork, constructing tie-ins to existing lock features, slope construction and protection, temporary shoring, drainage improvements, and site grading and restoration work. Demolition work at Lock 2 shall include the Upper Guide Wall and Upper Guide Wall Extension. The replacement Upper Guide Wall at Lock 2 will feature a tie-back anchor system to stabilize the new Upper Guide Wall and the adjacent slope up to state route KY-389. This anchor system will include an earth-retaining sheet pile wall at the base of the slope with tie-backs anchored into the bedrock. The construction will also include a concrete sidewalk with mooring pins along the edge of the newly constructed guide wall, earthwork and slope regrading, and stone slope protection. Demolition work at Lock 3 shall include the Upper Guide Wall. The replacement Upper Guide Wall at Lock 3 will feature a tie-back anchor system to stabilize the new Upper Guide Wall. This anchor system will include an earthretaining sheet pile wall at the base of the slope with tie-backs anchored into a sheet pile anchor wall. The construction will also include a concrete sidewalk with mooring pins along the edge of the newly constructed guide wall, earthwork and slope regrading, and drainage improvements. Bids will be received from Prime Contractors on a Lump Sum Bid Basis for the total project. All phases of work shall be bid to and through the Prime Contracting Firms. Bids shall be submitted in the manner herein described and on the official bid document form included with the conditions and specifications and shall be subject to all the conditions as set forth and described in the Bid Documents. All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the lump sum base bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instructions to Bidders and/or General Conditions. Bonds should be executed by a surety company authorized to do business in the Commonwealth of Kentucky. The Division of Engineering and Contract Administration, Commonwealth of Kentucky, reserves the right to reject any and all bids and to waive all informalities and/or technicalities where the best interest of the Commonwealth may be served. No bidder may withdraw his bid for a period of thirty (30) days after the date set for the opening of bids. Question Deadline 08/02/2023 at 5:00 PM ET

Bid Results

Water / Sewer

$8,043,000.00

Public - State/Provincial

Demolition, Site Work

60

14

21

7

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
58
Bidding Soon
1,212
All Active Projects
468
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2023

October 24, 2023

img_map_placeholder

KY-389, Lockport, KY

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.