BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Orange, California. Conceptual plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and playground / park / athletic field.

The City has ball fields at 10 of its 22 parks (El Camino Real, El Modena, Handy, Hart, Killefer, McPherson, Olive, Santiago Hills, Shaffer, and Steve Ambriz Parks). Many of these ball fields are located near or adjacent to residential neighborhoods, so an evaluation of ball fields at all 10 park locations was conducted to determine the need for field netting based upon safety and liability concerns caused by foul balls. Field netting installations would prevent foul balls from leaving the playing area and entering adjacent homeowner properties, passive park areas, and parking lots. Through a separate project, Hart Park Field Improvements (project number 30133), the City and its partners (Chapman University and Orange Lutheran High School) will install foul ball netting along the first and third baselines to protect the perimeter from foul balls at Diamond 1 located at Hart Park through a separate project (number 30133). The netting assessment proposed that ball field netting is needed at the following parks: El Modena, McPherson Athletic Center, and Steve Ambriz Park. Relative to Shaffer Park, the City will conduct an evaluation to ensure that the existing netting meets current standards. Project is included in the City of Orange's FY 2022-23 Budget CIP. As of September 13, 2022, information regarding a design team and a general contractor is not available. A firm timeline for construction has not been determined, however project is anticipated to be completed in June 2023.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Playgrounds / Parks / Athletic Fields

$1,420,900.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
100
Bidding Soon
2,341
All Active Projects
1,026
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

img_map_placeholder

Multiple Locations, Orange, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.