BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 9, 2025 at 7:00 PM

Updated January 10, 2025

Site work for a water / sewer project in Newburyport, Massachusetts. Conceptual plans call for site work for a water / sewer project.

As of January 9, 2025, this project was last included on the of Newburyport Fiscal Year 2025-2029 report released May 13, 2024. No additional information is currently available. There will be two phases of the project. No timeline information is available. This project is included in the City of Newburyport's fiscal year 2024-2028 Capital Improvement Program (CIP). As of November 15, 2023, further details regarding design and construction have not been identified. A firm timeline for construction has not been established; however, funding is allotted to fiscal year 2025. A detailed scope has not yet been released. A new Pump Station & Raw Water line from the Indian Hill Reservoir in some configuration to the existing Raw Water Station located on RT113. This concept has historically been discussed by staff and consultants for over twenty years. This is another project that addresses redundancy and resiliency (See 2020-21 Water Resource Protectn Plan from Tighe & Bond). The Upper & Lower Artichoke Reservoirs are stressed by high nutrient loading and potential flooding from the Merrimack River. These are current issues now that have a potentially higher negative impact to source water quality in the future. This project will give the City the ability to utilize the reservoirs system in a more efficient way, while addressing water quality issues (Algal Blooms & Flooding). This will set the Reservoir System up with more flex ability for future in Lake Treatment scenarios. Year 1: 0-30% design, Year 2: 100% design and bidding, Year 3: Construction. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$7,100,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

To Be Determined, Newburyport, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.