Site work and new construction of a laboratory facility in Manchester, Washington. Design plans call for the construction of a 24,000-square-foot laboratory facility; and for site work for a laboratory facility.

This project constitutes a ground up, new construction project of approximately 24,000 GSF to be located on the existing MRS campus west of Seattle, Washington, north of the town of Manchester. The magnitude of construction for this project is between $25.0M and $35.0M. A pre-solicitation notice was published on September 12, 2024. NOAA anticipates publishing the solicitation and supporting documents package on or about Tuesday, February 4, 2025, with the Offer/Receipt Date/Time: Friday, April 4, 2025, 12:00 PM Eastern Time (ET) for Phase I and Tuesday, June 17, 2025, 12:00 PM ET for Phase II. Closed sources sought/request for information notice has been included below for reference. ..................... National Oceanic and Atmospheric Administration Northwest Fisheries Science Center - Manchester Research Station New Lab & Aquaculture Facilities Combined Sources Sought (SS)/Request for Information (RFI) A. Notice Type: A.1 Sources Sought (SS)/Request for Information (RFI) No. NA-AJ5731-22-00358 B. Disclaimer: B.1 The purpose of this SS/RFI (as outlined in FAR 15.201(c) (7)) is to: 1) conduct market research pursuant to Federal Acquisition Regulation (FAR) Part 10 (Market Research), 2) canvass industry for innovative ideas and approaches for acquiring the ensuing described services, and to 3) identify businesses capable of performing the functions described herein. B.2 The Government is requesting information regarding the availability and feasibility of attracting firms that are capable of providing Domestic (CONUS - Contiguous US (48 states and territories)) Early Contractor Involvement services (to support the government's to be named later chosen A/E and construction firms) in support of the Department of Commerce, National Oceanic and Atmospheric Administration (NOAA), Acquisition and Grants Office (AGO), Corporate Services Acquisition Division (CSAD), Facilities Support Branch (FSB) requirements. B.3 This notice SS/RFI is issued solely for informational and planning purposes and does not constitute a future Request for Proposal (RFP) or a commitment on the part of the Government to release a solicitation for the services itemized below. B.4 Please note, responses to this SS/RFI are strictly voluntary and will not affect any respondent's ability to submit an offer if, and when, an RFP is released. There is NO bid package nor solicitation document associated with this announcement. The requested information additionally does not constitute a commitment, implied or otherwise, that a funded procurement action is imminent. B.5 Feedback and/or evaluations will not be provided regarding informational submission packages in response to this notice. Nor will any firm be entitled to remittance of payment(s) from the Government for direct or indirect costs, or resultant charges incurred as a result of any contractor information submission. B.6 Proprietary Information: The government shall not be liable for, or suffer any consequential damages for any improperly identified proprietary information. However, any and all proprietary information (if labeled as such) will be safeguarded in accordance with, and pursuant to, the applicable federal laws and regulations. C. Synopsis: C.1 The U.S. Department of Commerce's (DOC), National Oceanic and Atmospheric Administration (NOAA), Acquisition and Grants Office (AGO) is seeking information on potential sources interested in, and capable of, providing services under North American Industry Classification System (NAICS) 541310 for Architectural Services (primary) and 541330 Engineering Services (secondary) for Early Contractor Involvement (ECI) design and construction services necessary to build out new lab and aquaculture facilities at the Northwest Fisheries Science Center (NWFSC) Manchester Research Station in Manchester, Washington. C.2 Background: The National Marine Fisheries Service (NMFS) Northwest Fisheries Science Center mission supports the conservation and management of living marine resources and their habitats in the Northeast Pacific Ocean. NMFS research assists resource managers in making sound decisions that build sustainable fisheries, recover endangered and threatened species, sustain healthy ecosystems, and expand domestic seafood production through sustainable marine aquaculture. C.3 Required Services: If or when an RFP is formally issued, A/E vendors will be solicited for offers that can apply an ECI services (in support of the government's, to be named later, chosen A/E and construction firms) for Design/Build (D/B) delivery method and preconstruction services (as illustrated in Paragraph E below) and standard five (5) step design-build process services (i.e., team selection, project planning, design, construction, and post-construction) in accordance with the enclosed attached notional Scope of Work (SOW) and supporting documents and drawings for design and construction of: A new, energy efficient facility that will include modem laboratory facilities for data collection and research that focuses on understanding the life cycle of marine species and the impacts of ecosystem stressors on anadromous and marine fish and invertebrates. The facility will include but is not limited to the following program areas and facilities: a. Recirculating Aquatic System (fresh and saltwater) b. WetLabs c. DryLabs d. Facility Storage e. Gas Generation f. Freezer Storage g. Office Spaces h. Electrical, Mechanical and Communication Spaces j. Site work including utilities, sidewalks, parking, roadways, and landscaping k. Hatcheries (specialized flow through aquatic systems for ocean acidification and toxicology research, and recirculation aquaculture systems) C.3.1 If an RFP is formally issued, ECI included Design/Build (D/B) support will be expected for all tasks - to include furnishing all professional services, labor, material, equipment and items/services, unless otherwise specified herein C.3.1.1 Pricing: If an RFP is formally issued, the price shall also include all costs for project general requirements such as labor; materials; equipment; professional services; premiums for insurance; workers compensation insurance; license, permit and inspection fees; overhead; General Administrative (G&A); applicable customs, duties and taxes; profit and all other fixed price items/services, or otherwise fixed-priced items/services necessary for complete the subject project. C.3.1.2 LEED Certification: The Government will pursue "certifiable" Leadership in Energy and Environmental Design (LEED) Green Building Rating System Administered by the US Green Building Council (USGBC). The Contractor will be required to assist with meeting the LEED Silver criteria and provide all necessary documentation if an RFP is formally issued. C.4 Commissioning will be contracted separately by the Government. The ECI Contractor will be expected to participate in the enhanced commissioning process to include the design, construction and closeout phases. . Also, the ECI Contractor will provide design and constructability reviews of the Furniture, Fixture and Equipment (FFE) design services (by others) - to include but not limited to utility and support configuration. C.5 PLEASE TAKE NOTICE: The attached SOW is for the government's preselected A/E firm and not specifically for the ECI support contractor. It is merely designed to provide context as to the scale and complexity of the project for the ECI contractor selected if an RFP is formally issued. D. Place & Period of Performance: D.1 Place of Performance: Manchester Research Station, Northwest Fisheries Science Center (NWFSC) - 7305 Beach Dr. East, Port Orchard WA 98366 Kitsap County, Washington, United States. Located on the Puget Sound approximately 10 miles from downtown Seattle, on a 22-acre site located on the west side of Puget Sound in Washington state. NWFSC Weblink: https://www.fisheries.noaa.gov/about/manchester-research-station-northwest-fisheries-science-center D.2. Period of Performance: The completion date for this award is 897 calendar days from award to construction completion as follows in the attached SS/RFI E. Contract Type: E.1 Contract Type: NOAA/AGO looks to issue an RFP that will result in the award of one (1) stand-alone ECI included Design/Build (D/B) Fixed Priced Incentive (Successive Targets) (IAW FAR subpart 16.204 Fixed-price incentive contracts) construction contract that will cover both the design and construction phases of the requirements outlined in the enclosed attached draft SOW (Attachment 1). E.2 ECI Approach: If or when an RFP is officially issued, the solicitation intends to request preconstruction services and an option for construction services using the two-stage Early Contractor Involvement (ECI) approach as suggested in Figure 1: Outline of ECI Process incorporated in the attached SS/RFI. Under the ECI approach, the Contractor will initially propose a price for preconstruction services during design, and after a certain level of project definition, will provide an Initial Target Price and Initial Target Profit for the construction option. The Contractor shall provide preconstruction consulting services to assist the AE working for the Government with the development of the design of the facility described in the SOW and supporting documents and drawings. As further indicated in the Figure 1 panels, these services may include advice on the time and cost consequences of AE design decisions based on market conditions, material availability, constructability, sequencing and other services as described in the SOW and supporting documents and drawings, in order to obtain the best quality facility possible within the Ceiling Price and the required delivery schedule. Upon completion of the Pre-Final design (i.e., 95% design submission) by the Government's AE, the Government will provide the Pre-Final design package to the Contractor and the Government will request the Contractor to provide a firm fixed price proposal for the associated construction effort for that package. Then the Government and Contractor will negotiate a firm fixed price for the construction effort of the design package with the appropriate profit adjustments in accordance with FAR 52.216-17. The Government may then award the construction efforts for the design package. E.3. A description of the contemplated Contract Line Items (CLIN) structure is as follows: CLIN 0001 - Base - Preconstruction Services for NWFSC Manchester Research Campus Addition Design Drawings and Specifications (to include Geotechnical Investigation and Furniture, Fixtures & Equipment [FF&E] Design) CLIN 0002 - Option 1: Construction Service for NWFSC Manchester Research Campus New Lab and Aquaculture Facilities (Buildings B, C and D) CLIN 0003 - Option 2: Construction Service for RAS , Hatchery & Storage Facilities; NWFSC Manchester Research Campus New Lab and Aquaculture Facilities (Buildings A) CLIN 0004 - Option 3: Furniture, Fixtures & Equipment [FF&E] - Procure & Install E.1.3 A/E Firm Contract Restriction: PLEASE TAKE NOTICE: In compliance with federal guidelines and regulations, any design or construction firm affiliated with, or providing deliverables for the design phase effort of this project will be subject to FAR subpart 36.209 - i.e., "...no contract for the construction of a project shall be awarded to the firm that designed the project or its subsidiaries or affiliates, except with the approval of the head of the agency or authorized representative." F. Acquisition Schedule F.1 The approximate acquisition schedule is as follows: F.1.1 This Sources Sought/RFI notice will be posted on the Contract Opportunities page (formerly FedBizOpps) of the System for Award Management (SAM.gov) at https://sam.gov/content/opportunities for a minimum of fifteen (15) days. F.1.2 Respondents must electronically submit requests for clarifications via e-mail (IAW Subparagraph H.6 below); along with a company profile, (in accordance with Paragraph G below), any additional supporting statement of capability and/or supplemental information/documentation germane to completion of the aforementioned project (as instructed in Paragraph H below), and key personnel qualifications (see Subparagraph G.1.3) in Portable Document Format (PDF) form no later the submission deadline prescribed in Paragraph M below. F.1.2.1 PLEASE TAKE FURTHER NOTICE: Paper copies of this notice will not be mailed to vendors. No will paper versions of information package submission be accepted by the Government as well. F.2 If this Sources Sought/RFI results in the issuance of a formal Request for Proposal (RFP) for the aforementioned design services, said RFP will be posted on the Contract Opportunities page (formerly FedBizOpps) of the SAM.gov approximately around or near, mid-to-late October 2022 - upon which potential offerors will have approximately thirty (30) days to submit proposals. F.3 Be advised that all RFP dates are approximations and will be subject to change; and that any change will be posted via the SAM.gov, Contract Opportunities page. It therefore will be the responsibility of any and all potential offerors to monitor that Government Point of Entry (GPE) for any changing information pertaining to this Sources Sought/RFI notice and future solicitations. G. Information Submission Requirements: G.1 It is requested that firms provide the following information: G.1.1 Cover Page: For the Government's quick reference, respondents must complete Attachment 2 (Sources Sought/RFI Cover Page) and utilize it as a coversheet for the capability statement and other pertinent information requested in subsequent paragraphs. G.1.2 Capability Statement: The anticipated NAICS codes assigned to this procurement is 541310 for Architectural Services (primary) and 541330 Engineering Services (secondary). Interested parties must demonstrate in a basic three (3) to six (6) page well-spaced text capability statement encompassing elements and features such as: an introduction and company overview; core competencies; description of products and/or services; subcontracting plans; previous significant projects and performance, especially projects of a similar nature and size; previous experience with early contractor involvement or construction management at-risk (CMAR) project deliveries; management profile/s; major clients; contact details; and how the firm is qualified to perform (or subcontract, partner, or Joint Venture (JV)) the work outlined in Attachment 1. G.1.3 Additional Information: An additional five (5) to ten (10) pages of information may be submitted at the respondent's discretion (e.g., sales brochures, video links, other marketing information materials, etc.) to supplement the information provided under Subparagraphs G.1.1, and G.1.2; or furnish innovative ideas and approaches for acquiring the services described herein. Said additional information should support the firm's ability to provide: G.1.3.1 Professional services of a construction engineering nature: Which are required to be performed or approved by a person licensed, registered, or certified to provide the services as described in subparagraph G.1.3.1(ii) and G.1.3.2 below; and/or Performed by contract that are associated with research, planning, development, design, construction, alteration, or repair of real property. G.1.3.2 Other professional services of an architectural or engineering nature, or incidental services, which members of the architectural and engineering professions (and individuals in their employ) may logically or justifiably perform, including: studies, investigations, surveying, mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services, soils engineering, drawing reviews, preparation of operating and maintenance manuals, and other related services. esday, September 7, 2022. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Design

Laboratories

$35,000,000.00

Public - Federal

New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
48
Bidding Soon
896
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2025

May 5, 2025

img_map_placeholder

7305 Beach Dr E, Manchester, WA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.