BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Moundville, Alabama. Completed plans call for site work for a water / sewer project.

As of October 6, 2022, this project has not yet been awarded. A timeline for award has not yet been established. Award of the Contract will be made within forty-five (45) calendar days from the date of the bid opening. The Project shall be known as City of Moundville County Road 46 Water Main Replacement and the general character of said project shall consist of 16" DI water mains and appurtenances. All bidders must be responsible, meeting the criteria and requirements set forth in the Instructions to Bidders and bid proposal. The attention of all bidders is called to the provisions of State law governing "general Contractors," as set forth in AL. CODE 34-8-1, et seq. (1975), and rules and regulations promulgated pursuant thereto. The Owner may not enter into a contract with a non-resident corporation or entity which is not qualified under State law to do business in the State of Alabama. All bidders shall possess all other licenses and/or permits required by applicable law, rule or regulation of the performance of the work. All bidders must submit with their proposal, Contractor's license number and a copy of the license. State law, AL CODE 34-8-8(b), requires all bids to be rejected which do not contain the General Contractor's current license number. 4. Each bidder must submit with its bid a cashier's check drawn on an Alabama bank or a fully executed bid bond on the form that is contained in the Contract Documents executed by a surety company duly authorized and qualified to make bond in the State of Alabama. All bonds, sureties and/or cashier checks will be made payable to the Owner for an amount not less than 5 percent of the Owner's or its Engineer's estimated cost of the project or of the total bid in the proposal, but in no event more than $10,000.00. 5. A Pre Bid Conference is not required for this project. 6. All bidders are advised to carefully read the Instructions to Bidders contained in the Contract Documents, which provisions and requirements are adopted herein by reference.

Bid Results

Water / Sewer

$848,864.00

Public - City

Site Work

8

10

2

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
48
Bidding Soon
512
All Active Projects
197
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2022

November 1, 2022

img_map_placeholder

Co Rd 46, Moundville, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.