BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Winchendon, Massachusetts. Conceptual plans call for the renovation of a water / sewer project.

Bid was canceled and not going to republish. Operation of Waste Water Plant The scope of services for wastewater operations and maintenance includes the wastewater treatment facility described below. Wastewater Treatment Facility. The Winchendon Wastewater Treatment Facility (WWTF) was upgraded in 1973 and 2004 to provide secondary treatment of wastewater. The facility is designed to handle an average daily flow of 1.1 million gallons with peak hour of 4.9 million gallons. The facility is located on the south bank of the Millers River, north of River Street. The access road to the facility is off River Street, approximately one mile from the intersection of Main and River Street. Process Description. Raw wastewater enters the facility through a 24-inch influent line, from which point it flows by gravity through the influent Parshall flume. Flow is macerated in the influent channel grinder, then the wastewater flows from the channel grinder to the two primary clarifiers. The 45-foot diameter primary clarifiers are used to settle the primary sludge and waste secondary sludge's are co-settled. The settled sludge's are pumped from the primary clarifiers to the sludge blend tank for processing and disposal. From the primary clarifiers, the wastewater flows to the secondary treatment system, which includes two aeration basins and two 70-foot diameter secondary clari-flocculators. Treated wastewater is discharged from the secondary treatment system and flows by gravity to the ultra-violet disinfection system tanks. Following disinfection, the flow is discharged to the effluent Parshall flume and then to the Millers river. Activated sludge can be both recycled to the aeration basins, and/or wasted out of the system as required. Waste activated sludge (WAS) can be pumped to the primary clarifiers for co-settling, or to the sludge blend tank, which flows by gravity into the gravity sludge thickener. Alternatively, WAS can be directly pumped to a tanker truck. One 26-foot diameter gravity thickener is used for thickening the combined sludge's up to 6 percent. Currently, thickened sludge is hauled to a neighboring community where it is dewatered. Each proposal must be accompanied by a binding proposal security deposit in the form of a bid bond or certified check in the amount of one hundred thousand dollars ($100,000). The deposit shall be made payable to the Town of Winchendon During any construction work performed by CONTRACTOR, CONTRACTOR shall ensure that Massachusetts prevailing wages are paid for such work, and that the CONTRACTOR furnishes a performance bond and payment bond each in the amount of 100 percent of the cost of construction issued by a surety qualified to do business in Massachusetts and satisfactory to the TOWN.

Project Abandoned

Water / Sewer

$2,550,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
607
Active Projects
369
Bidding Soon
4,771
All Active Projects
1,984
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 29, 2022

November 30, 2022

img_map_placeholder

637 River St, Winchendon, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.