BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Sedona, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Navoti Drive to Dry Creek Road Shared Use Path (SUP) Improvements Project Phase-1 This project will include construction of a shared use path. The project consists of grading, drainage and paving. A stabilized decomposed granite shared use path of varying width (8-feet to 10-feet) will be constructed along with associated retaining walls, and a street crossing throughout the project corridor. The project also includes parking area construction improvements within the project corridor. CONTRACT TIME: 120 calendar days after the Notice to Proceed LIQUIDATED DAMAGES: $430.00 per day beyond the 120-calendar day Contract Time Each bidder's proposal shall be made on forms famished In the Contract Documents, and must be accompanied by a security consisting of a certified check, cashier's check, or bid bond in an amount of not less than ten percent (10%) of the amount of the total bid amount, and made payable to the CITY OF SEDONA, ARIZONA, in the event the successful Bidder, within ten (10) calendar days after award of the Contract, fails to enter into a Contract or fails to post payment and performance bonds satisfactory to the City insuring the faithful fulfillment of the Contract as required by law, the security deposit on this bid shall be forfeited to the City. The successful Bidder will be required to furnish two (2) bonds. One (1) bond, to become effective upon award of the Contract, shall be a Performance Bond substantially in the form in the bid documents, and shall be in a sum of one hundred percent (100%) of the contract price including any additions to the Contract. The Bond shall be effective throughout the construction period, including a two (2) year warranty period. The successful Bidder shall also furnish a Labor and Material Payment Bond, substantially in the form attached, to become effective upon award. Said Labor and Material Bond shall be in the amount of one hundred percent (100%) of the Contract price. The successful Bidder will be determined on the basis of the lowest responsive and responsible Proposal. The City of Sedona, Arizona reserves the right to reject any or all Proposals, to waive or not to waive any informalities, or irregularities in the Proposals received, and to accept a Proposal which in its judgment best serves the interests of the City. All questions should be directed in writing to James Crowley, Associate Engineer, 1G2 Roadrunner Drive, Sedona, Arizona 86336, or email JCrowley@sedonaaz.gov

Award

Roads / Highways

$498,695.00

Public - City

Paving, Site Work

9

10

2

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
75
All Active Projects
19
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.