EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 2, 2022 at 7:00 PM

Updated January 25, 2024

Renovation of a civil project in Moulton, Alabama. Completed plans call for the renovation of a water / sewer project.

As of 12/02/2022 They do not have an anticipated start date/end date yet. For furnishing all labor and materials, and performing all work described as follows: Moulton Water System SCADA Improvements The project consists of SCADA Distribution System Improvements. The project is funded by a Drinking Water State Revolving Fund loan (DWSRF FS010193-02) through the Alabama Department of Environmental Management (ADEM). Compliance with all applicable Federal, State, and local laws, rules, and regulations are required. Performance and Labor and Material Payment Bonds, proof of insurance, and a complete list of subcontractors and suppliers will be required prior to the signing of the Contract. A Performance Bond in an amount equal to one hundred percent (100%) of the contract costs and Labor and Material Payment Bond in an amount of one hundred percent (100%) of the contract cost in the form and terms approved by City of Moulton will be required at the signing of the contract. In addition, the Contractor must furnish to City of Moulton at the time of the signing of the contract a certificate of insurance coverage as provided in the specifications. The right is reserved to reject any and/or all bids and to waive informalities and to furnish any item of material or work to change the amount of said Contract. No bids will be considered unless the bidder, whether resident or non-resident of Alabama, is properly qualified to submit a bid for this construction in accordance with all applicable laws of the State of Alabama. This shall include evidence of holding a current license from the State Licensing Board for General Contractors, Montgomery, Alabama, as required by Chapter 8 of Title 34, of the Code of Alabama, 1975. In addition, non-residents of the State, if a corporation, shall show evidence of having qualified with the Secretary of State to do business in the State of Alabama. The bidder shall show evidence by clearly displaying the current license number on the outside of the sealed envelope in which the bid is delivered. In addition, bids shall be clearly identified on the exterior of the package with the bidders name, address, the name of the project being bid, and time and place of the bid opening. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days. The Owner reserves the right to reject any or all bids and to waive technical errors if the best interest of the Owner will thereby be promoted. All bids received after the date and time of the bid opening noted above will be returned unopened

Award

Water / Sewer

$257,150.00

Public - City

Renovation

3

16

2

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Surveys
Division 08 - Openings

Division 08 - Openings

Hardware
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Network Equipment
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Wireless Communications Distribution, UHF/VHF Transmitters and Antennas
Division 34 - Transportation

Division 34 - Transportation

Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
55
Bidding Soon
564
All Active Projects
248
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2022

November 3, 2022

img_map_placeholder

Multiple Locations, Moulton, AL

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Moulton Water System SCADA Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.