Published March 29, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a transportation facility in Philadelphia, Pennsylvania. Completed plans call for site work for a transportation facility.

The contract duration is 30 calendar days from the notice to proceed. The "Work includes but is not limited to: general contractor to perform steam panel upgrade per specification and drawings. All questions must be submitted by Thursday, September 8, 2022 at 12:00pm to be guaranteed an answer. Any inquiries regarding this bid and any request for change, modification, or clarification of any aspect of these Contract Documents must be made in writing to SEPTA at least eight (8) calendar days prior to bid opening in order for consideration to be given by SEPTA to affect a change in the Contract Documents. Any inquiries regarding this bid must be directed to Racquel Burden of the Procurement, Supply Chain and DBE Division at rburden@septa.org or (215) 580-8316. A change, modification, or clarification to the Contract Documents can only by affected by a written Addendum issued by SEPTA via our ePS. All bids must be submitted through SEPTA's Electronic Procurement System (EPS). Mailed or hand delivered bids will be rejected. The Bid will be opened electronically on the scheduled Opening Date/Time and will be secure and unreadable by SEPTA until that time. Attendance at the Bid Opening meeting is not mandatory. No bid will be opened and considered that is submitted later than the time specified. SEPTA retains the right to reject any and all bids, as determined to be in the best interest of SEPTA. Each bid submitted shall remain firm for at least ninety (90) days from the date of the Bid Opening and may not be withdrawn in whole or in part during that time. By submitting a bid, the bidder certifies that the bid price is held firm for that time and any extension thereof. SEPTA, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4, and Title 49,Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-Assisted Programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in regard to any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation, and will not be discriminated against on the grounds of race, sex, color, or national origin in consideration for an award. Contractor will be required to comply with all applicable Equal Employment Opportunity laws and regulations. All bidders will be required to certify compliance with Executive Order 12549 (ineligible contractors). Any contract issued as result of this solicitation is subject to a financial assistance contract between SEPTA and U.S. Department of Transportation. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

Award

Transportation Terminals

$268,000.00

Public - State/Provincial

Site Work

14

16

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Quality Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Project Identification, Execution and Closeout Requirements, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Site Improvements, Fences and Gates
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
429
Active Projects
225
Bidding Soon
4,027
All Active Projects
1,690
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2022

October 13, 2022

img_map_placeholder

John F Kennedy Blvd & N 16th St, Philadelphia, PA

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Suburban Station Steam Connection Panel Relocation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.