BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a detention facility in Sandy Hook, Kentucky. Completed plans call for the construction of a detention facility; and for site work for a detention facility.

Project Number- 2021-080-S, 2021052 527-CAL4-LS08-00 The new housing units at Little Sandy Correctional Complex will consist of 2 housing unit types herein referred to as Building GC and GD. Building GC will consist of 4 housing units double bunked and under direct supervision. All support and program spaces will be accessible from the pod. A central core will house administrative staff and group treatment rooms. HU1 will contain a cell tier, typical in all housing units. All units within Building GC are planned for medium security. General Population Building GD will consist of 2 housing units double bunked and an additional 2 housing units of mental health (pod) units under direct supervision. All 4 units will contain support, and program spaces found in Building GC. The mental health units will contain sub-dayrooms to restrict the flow of inmates on both the ground floor and the mezzanine. The central core will mimic Building GC with spaces for administrative staff and treatment areas. Both general population and segregation units will have mezzanines. 2 housing pods will be medium security, general population. The 2 remaining mental health units will be maximum security. Service Start : 10/1/2022 Service End : 11/29/2024 ** Prebid meeting - The background check form (following the Advertisement of Bids) must be submitted to Warden McKenzie, donalds.mckenzie@ky.gov by 4:00 PM, Eastern Time on September 2, 2022. List at least two people on the background check form. When forwarding the background check form DO NOT COPY ANYONE; SEND ONLY TO THE WARDEN. You must show proof of COVID vaccination. Face masks are also required to be worn during the prebid meeting.

Award

Jails / Prisons

$95,840,000.00

Public - State/Provincial

New Construction, Site Work

289

33

8

6

Subscribe For Documents

97 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
32
Bidding Soon
594
All Active Projects
275
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2022

October 14, 2022

img_map_placeholder

505 Prison Connector, Sandy Hook, KY


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.