Demolition, site work, paving and new construction of a bridge / tunnel in Dunn, North Carolina. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for paving for a bridge / tunnel; and for site work for a bridge / tunnel.

WBS Element: 45586.3.1 County: Sampson County Contract No.: DC00260 TIP No.:B-5631 Federal Aid No: BRZ-1620(004) The North Carolina Department of Transportation is Requesting Bids for B-5631 Sampson Bridge 169 Replacement. All Quantities Are Estimates Only. The Contractor Must Furnish Labor, Equipment, and Traffic Control. The department of transportation does not exclude any person from participation in, deny any person benefits of, or otherwise discriminate against anyone in connection with the award and performance of any contract covered by this program on the basis of race, color, sex, political affiliation/influence, or national origin. The availability date for this project is October 31, 2022. The completion date is November 20, 2023. A bid bond or bid deposit in the amount of 5% of the total amount bid will be required. The bidder shall submit an electronic bid bond with each electronic bid submittal unless a bid deposit is furnished instead. All prospective bidders shall be prequalified with the department of transportation prior to submitting a bid. Contractors who are not prequalified may obtain information and forms for prequalifying from the contractual services unit, division of highways, department of transportation, 1509 mail service center, raleigh, n. C. All required prequalification statements and documents shall be filed with the contractual services unit at least four weeks prior to the date of opening bids. Statements of disadvantaged business enterprises participation must be presented with the bids. Dbe goal is 3% for this contract. Please Refer to the Contract Id# Referenced When Making Inquiries Regarding This Project. If You Have Questions, or Need Additional Information Concerning This Project, Contact Dan Cumbo, Pe at 910-682-5100 or Email Drcumbo@ncdot.gov The right is reserved to reject any or all bids. NCDOT - Sampson Bridge 169 Replacement location- 1620 Timothy Rd #169Dunn, NC 28334, USA

Award

Bridges / Tunnels

$966,494.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Post-Tensioned Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Steel Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
68
Bidding Soon
1,316
All Active Projects
493
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2022

October 31, 2022

img_map_placeholder

Timothy Rd, Dunn, NC

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Sampson Bridge 169 Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.