Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, new construction and renovation of a mixed-use development in Storm Lake, Iowa. Completed plans call for the construction of a educational facility; for the renovation of a educational facility; for site work for a educational facility; laboratory facility; laboratory facility; laboratory facility; and playground / park / athletic field.
Project #1 - Storm Lake Learning Center, 323 W 20th Street, Storm Lake, Iowa 50588 The new Iowa Central Community College Learning Center on the Storm Lake Campus will be a 24,000 square foot facility, primarily housing classroom and laboratory spaces as well as administrative offices. The main level will consist of 13,000 square feet of finished space, while the 11,000 square feet upper-level space will be designed as a shell space to house additional classroom and lab spaces. This project is currently in the 90%+ design development phase with a projected one (1) year construction schedule and tentative completion date of December 2023. Project #2 - Biofuels Laboratory, 1320 A Street W, Fort Dodge, Iowa 50501 Iowa Central Community College continues to be a leader in the biofuel testing industry. The new Iowa Central Biofuels Laboratory will be a 9,300 square foot building, housing office and laboratory space for biofuel testing. This laboratory will be used to conduct biofuel testing utilizing state of the art equipment. This project is currently in the 90%+ design development phase with a projected one (1) year construction schedule and tentative completion date of December 2023. Project #3 - Crimmins Building Exterior Envelope Improvements, 1142 14th Street SW, Fort Dodge, Iowa 50501 The Crimmins Building is an existing 93,000 square foot facility consisting of mainly sheet steel roofing and siding exterior. This project will be focused on exterior material upgrades to the existing facility to include roof replacement and repairs, replacement of exterior siding, windows, and doors, along with improving insulation quality throughout the facility. This project is currently in the design development phase with a projected one (1) year construction schedule and tentative completion date of December 2023. Project #4 - Athletic Field Turf Upgrade, One Triton Circle, Fort Dodge, Iowa 50501 Iowa Central Community College currently utilizes approximately 200,000 square feet of green space located on the southeast portion of campus for athletic practices and other activities. This area is currently a grass field. This project is focused on improving the green space by overlaying a synthetic turf field on the existing grass area. This project is currently in the design development phase with a projected four to six (4-6) month construction schedule. The College invites you to submit your firm's qualifications for provide Construction Management at Risk (CMaR) services to support the following areas on the above-described College projects: 1. Pre-construction Phase 2. Bidding Phase 3. Construction Phase 4. Close-out Phase Iowa Central Community College was founded in 1966 and has been lauded as one of the top Iowa colleges. Now, with over 100 programs to choose from and an array of student activities, Iowa Central provides an affordable and enriching alternative to four-year universities. Student can attend classes at one of five campus locations in Fort Dodge, Storm Lake, or Webster City for exceptional hands-on learning, while Iowa Central online classes offer a flexible distance-learning opportunity for many of our students. The College is seeking responses from firms that specialize in all phases of construction including those listed within as well as experience in the construction of higher educational facilities. Please direct all project-specific questions to: o Storm Lake Learning Center and Crimmins Building Exterior Envelope Improvements o ISG, Inc. Attn: Art Baumgartner 217 East 2nd Street, Suite 110 Des Moines, IA 50309 Office: 515-243-9143 Email: Art.Baumgartner@ISGInc.com o Biofuels Testing Lab Facility o CRB Group Attn: Eric Danielson 1251 N.W. Briarcliff Parkway, Suite 500 Kansas City, MO 64116 Office: 816-891-3693 Email: Eric.Danielson@crbgroup.com o Athletic Fields Improvements o OPN Architects Attn: Brett Mendenhall 100 Court Ave, Suite 100 Des Moines, IA 50309 Office: 515-309-0722 Email: bmendenhall@opnarchitects.com The purpose of this request is to obtain statements of qualifications from firms offering construction management services. The CM will work directly with its selected architectural firm to provide input and analysis on total project cost, sequencing, and constructability issues during the planning phase of each project. The selected Construction Management firm should be prepared to provide additional services to support the College's public information effort prior to any public meeting. For additional description of the anticipated scope of construction management services see Exhibit A. A College representative will publicly open and read aloud the names of the firms who submit Statements of Qualification. The College reserves the right to waive any deficiencies or irregularities in any RFQ responses and to decide which three top scoring qualified firms should be asked to submit a proposal in the best interest and value of the College.
Post-Bid
Educational
$50,000.00
Public - State/Provincial
New Construction, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 3, 2022
February 3, 2023
Multiple Locations, Storm Lake, IA
Related To This Project
Storm Lake, IA
Bid Date: Jan 23 2023
Storm Lake, IA
Bid Date: Feb 13 2023
Storm Lake, IA
Bid Date: Feb 02 2023
Storm Lake, IA
Bid Date: Nov 19 2020
Storm Lake, IA
Bid Date: Mar 07 2023
Storm Lake, IA
Bid Date: Mar 07 2023
Storm Lake, IA
Bid Date: Mar 23 2023
Storm Lake, IA
Bid Date: Apr 27 2023
Storm Lake, IA
Bid Date: Aug 09 2022
Storm Lake, IA
Bid Date: Aug 25 2022
Storm Lake, IA
Bid Date: Dec 10 2019
Storm Lake, IA
Bid Date: Jan 20 2021
Storm Lake, IA
Bid Date: Jun 24 2020
Storm Lake, IA
Bid Date: Jun 25 2020
Storm Lake, IA
Bid Date: May 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.