Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 5, 2022 at 8:00 PM

Updated September 15, 2023

Site work and outdoor lighting for a playground / park / athletic field in Conway, South Carolina. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

Provide and install new field lights for new soccer field with supporting utilities for future building and scoreboard. Project Location: Atlantic Center Industrial Park, 369 Allied Drive, Conway, SC 29526 Construction Cost Range: $1,400,000 to $1,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Playgrounds / Parks / Athletic Fields

$1,137,250.00

Public - State/Provincial

Outdoor Lighting, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
65
Bidding Soon
935
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2022

January 23, 2023

Project location map

369 Allied Dr, Conway, SC

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed