BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Appomattox, Virginia. Contact the soliciting agency for additional information.

A. Refuse Pickup Requirements o The Contractor shall provide all labor, supervision, transportation, equipment, supplies, and material necessary to collect and dispose of refuse content from Holliday Lake State Park o The Contractor shall provide containers and dispose of the refuse therein in a manner approved by the Commonwealth of Virginia, Department of Health, Department of Waste Management, and all applicable Federal, State and Local laws. o All refuse removed shall be disposed of in a state approved sanitary landfill. The Contractor shall provide evidence the landfill has been approved by the Virginia Department of Health and/or the Virginia Department of Environmental Quality. o The Contractor shall provide suitable containers designed for heavy trash service. The containers shall be designed to provide rodent-proof, animal-proof, and wind-proof storage of items. The Commonwealth prefers the use of containers with metal lids. o The Contractor shall be responsible for the maintenance and repair of the metal container placed in compliance with this contract. The container shall be maintained in a constant state of repair, preservation and neat appearance. In addition, the contractor shall respond within eight (8) hours to all repair and/or service calls and shall replace any component of the container that requires repeated maintenance/repair service. B. General Service Requirements: o The Contractor's staff shall be responsible for cleanup of any spillage or leakage on the property during the transporting of refuse and/or recycling away from collection areas. At the completion of each pick up, it shall be the responsibility of the driver of the equipment to clear the immediate/adjacent area(s) of any debris which may be a result of his actions-by whatever method. o Waste materials that are blown by the wind shall be recovered and disposed of by the equipment operator or his/her assistant. In no case shall the operator leave a site with waste materials in the area. o The Contractor shall make provisions for all containers to be supported in such a manner as to minimize tipping or spilling and shall be responsible for keeping the area around the containers free of garbage and refuse. C. The Contractor shall take reasonable precautions to prevent damage to roadways, and any other areas. Contractor's Staff: o The Contractor shall provide an adequate number of reliable and properly trained personnel to provide the services required. o The Contractor shall provide a driver who possesses a valid commercial driver's license and adequate number of personnel on each collection truck to ensure refuse/recycling is loaded properly and ensure cleanliness of the refuse/recycling staging area(s). D. Optional container rentals, pick-ups, and services where available. o The Contractor shall provide optional container, to include but not limited to 20yard and 30yard roll off containers, rentals, pick-ups, and services upon request. o The Contractor shall be required to supply additional containers for special purposes. This includes, but is not limited to: recyclable materials, special events, construction/renovation debris, non-hazardous waste removal, bulky and/or weight materials, segregated materials for construction waste recycling, etc. Service will be upon request at a cost determined at that time but consistent with contract pricing. E. INCLEMENT WEATHER: Should inclement weather conditions or problems beyond the control of the Contractor interrupt or delay service, the Contractor shall advise the park designee of the following: o Service stoppage or delay, and o Date of alternate pick up(s) o Charges o The subsequent contract will be a firm-fixed price agreement. The fee(s) will remain firm and will include all charges that may be incurred in fulfilling the requirements of the contract during the first 365 days Pricing shall be all inclusive and shall include any landfill fees and fuel surcharges.

Post-Bid

Playgrounds / Parks / Athletic Fields

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
35
Bidding Soon
553
All Active Projects
247
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2022

October 10, 2022

img_map_placeholder

2759 State Park Rd, Appomattox, VA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.