Site work and paving for a mixed-use development in Parker, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The extent of the work is approximately as follows: Construction of roadway improvements at/near the Mainstreet/Canterberry Parkway intersection to provide access to a proposed open space park. Work includes but not limited to, approximately 335 SY of 10-inch thick concrete pavement, 285 tons of hot mix asphalt (BMA) pavement, 250 CY of unclassified excavation, installation of a water quality structure, associated concrete flatwork (sidewalk, curb & gutter and median cover), modifications/improvements to the existing mast arm traffic signal, erosion control, pavement markings and traffic control. Bids may not be withdrawn for a period of forty-five (45) days after the time fixed for closing them. The Owner reserves the right to waive irregularities, to waive technical defects accordingly as the best interest of the Town may be served, may reject any and all bids, and shall award the contract to the lowest responsible bidder as determined by the Owner. All bidders question d inquires shall be directed to the Town of Parker's Project Manager, Tom Gill at 303-805-319 tgill@parkeronline.org. e":47 Tom Williams, PE, Engineering/Public Works Director The purpose of this notice is to comply with C.R.S. 8-19-104(3). If a nonresident bidder is from a state that provides a bidding preference to bidders from that state, then a comparable percentage disadvantage will be applied to the bid of that nonresident bidder. All bids must be accompanied by a Bid Bond in an amount of at least five percent (5%) of the Bid. The vendors can upload their bid bond when responding . The bond will be retained by the Town as liquidated damages if the successful bidder refuses or fails to enter into a Contract and Performance, Payment and Maintenance bond in accordance with his bid when notified of the award.

Award

Roads / Highways

$910,934.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
54
Bidding Soon
986
All Active Projects
404
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2022

November 15, 2022

img_map_placeholder

Canterberry Pkwy & Mainstreet, Parker, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.