Published September 29, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a water / sewer project in Liberty, Mississippi. Completed plans call for site work for a water / sewer project.

This bid includes, but is not limited to, replacement of the two existing pumps at the Carroll Creek lift station. Five (5) floating 5 hp surface aerators along with controls will be installed at the lagoon to replace the existing aeration pumps. An existing wooden pier structure approximately 50 feet long by 4 feet as well as a wooden stairway and railings approximately 40 feet long by 4 feet wide will be replaced with new. The above general outline of features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plants, labor, equipment, and materials required by the specifications and the drawings referred to therein. This project is covered by the requirements of Section 3 of the Housing and Urban Development Act of 1968 (12 U.S.C. 1701u) ("Section 3"). Section 3 requires that when employment or contracting opportunities are generated by HUD-funded projects, preference is given to low and very low-income persons and businesses residing in the community where the project is located. Therefore, Section 3 businesses are encouraged to submit a bid as preference will be given for Section 3 businesses if all other requirements are met. A bidder selected for this Project will be responsible for ensuring compliance with Section 3 requirements including, but not limited to, the hiring and contracting decisions made on the Project. Contract time shall be 120 consecutive calendar days from the effective date shown in the Notice to Proceed. Liquidated damages will be assessed for each consecutive calendar day beyond the specified contract time in the amount of $200 per day. Special Damages - in addition to the amounts provided for liquidated damages, Contractor, in the event of such default, shall pay to the Owner any actual costs reasonably incurred by Owner for engineering and inspection forces employed on the work after the time stipulated for completion of the work and other costs as may be reasonably incurred. Bidder must be qualified under Mississippi Law and show current Certificate of Responsibility issued by the Mississippi State Board of Public Contractors establishing his classification as to the value and type of construction on which he is authorized to bid. Each Bidder shall write his Certificate of Responsibility Number on the outside of the sealed envelope containing his proposal. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. Each Bidder is requested to submit with his proposal a separate attachment stating his qualifications to perform the work. The Statement of Qualifications shall list past projects of similar size and nature, a list of references with name and telephone number, a list of key personnel who will perform the work, and other information supporting the bidder's qualifications. Awarding public contracts to non-resident Bidders will be on the same basis as the non-resident bidder's state awards contracts to Mississippi Contractors bidding under similar circumstances. In order to ensure that Mississippi's so-called Golden Rule is followed state law requires a non-resident bidder to attach to his bid a copy of his resident state's current laws pertaining to such state's treatment of non-resident contractors. Each Bidder must deposit with his proposal, a Bid Bond or Certified Check in an amount equal to five percent of his bid, payable to the Owner, as bid security. Bidders shall also submit a current financial statement, if requested, by the Owner. The successful bidder will be required to furnish a Payment Bond and Performance Bond each in the amount of 100 percent of the contract amount. Minority and women's business enterprises are solicited to bid on this contract as prime contractors and are encouraged to make inquiries regarding potential subcontracting opportunities and equipment, material and/or supply needs. The Owner reserves the right to reject any and all bids and to waive any informalities or irregularities therein.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Site Improvements, Fences and Gates, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Machining Equipment, Drilling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
30
Bidding Soon
386
All Active Projects
173
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2022

October 26, 2022

img_map_placeholder

Multiple Locations, Liberty, MS

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Sewer System Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.