Site work and new construction of a water / sewer project in Rapid City, South Dakota. Completed plans call for the construction of a water / sewer project.

The work consists of all work associated with the construction of a new BPS flow capacity of 3,600 gpm and a total dynamic head of 205 feet. This work includes but is not limited to: site grading, landscaping, 16 and 20 inch PVC site piping and related appurtenances, sanitary sewer connection to the existing sanitary sewer system, excavation and backfill, stormwater pollution prevention, concrete generator pad, asphalt parking lot, concrete driveway and approach, site fencing, 80' by 36' with 14' side wall height pump station building. . Every request for such interpretation shall be in writing and addressed to Brian Hoellein, PE, Bartlett & West, Inc. 2921 E. 57th Street, Sioux Falls, SD 57108, Phone; 605-373-5909, Email; brian.hoellein@bartwest.com Building to consist of spread concrete footings, concrete floor, concrete pipe gallery, interior cement masonry unit structural walls, exterior brick veneer, wood roof trusses, asphalt shingles, 1 ton bridge crane, four (4) horizontal split case pumps (1200 gpm @ 205 TDH), one (1) vertical multi-stage pump (675 gpm @ 110 TDH), ductile iron pipe and fittings from 4 inch through 20 inch, gate valves, silent check valves, 12 and 6 inch swing check valves, 4 inch globe style pressure relief valve associated with surge control, 12 inch plug valve associated with bi-directional flow control, 6 inch globe style flow control valve for low flow conditions, one (1) 6 inch magnetic flowmeter, one (1) 12 inch magnetic flow meter, one (1) 16 inch magnetic flow meter, one (1) 20 inch magnetic flow meter, pipe supports, and painting and coating. Plumbing includes floor drains, service sink, and restroom. Heating and ventilation equipment including natural gas furnace/cooling units, minisplit units, and associated duct work. Electrical consisting of LED lighting, four at 100 Hp, and one at 40 Hp variable frequency drives, electrical switch gear, installation of buried conduit for All written questions must be received by 11:00 a.m Mountain Time (12:00 p.m. (Noon - Central Time) on Thursday December 7, 2023.

Award

Water / Sewer

$5,095,000.00

Public - City

New Construction, Site Work

109

27

4

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
5
Bidding Soon
67
All Active Projects
25
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2023

January 11, 2024

img_map_placeholder

E Anamosa St & E Philadelphia St, Rapid City, SD

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.