Site work and new construction of a water / sewer project in Rapid City, South Dakota. Completed plans call for the construction of a water / sewer project.
The work consists of all work associated with the construction of a new BPS flow capacity of 3,600 gpm and a total dynamic head of 205 feet. This work includes but is not limited to: site grading, landscaping, 16 and 20 inch PVC site piping and related appurtenances, sanitary sewer connection to the existing sanitary sewer system, excavation and backfill, stormwater pollution prevention, concrete generator pad, asphalt parking lot, concrete driveway and approach, site fencing, 80' by 36' with 14' side wall height pump station building. . Every request for such interpretation shall be in writing and addressed to Brian Hoellein, PE, Bartlett & West, Inc. 2921 E. 57th Street, Sioux Falls, SD 57108, Phone; 605-373-5909, Email; brian.hoellein@bartwest.com Building to consist of spread concrete footings, concrete floor, concrete pipe gallery, interior cement masonry unit structural walls, exterior brick veneer, wood roof trusses, asphalt shingles, 1 ton bridge crane, four (4) horizontal split case pumps (1200 gpm @ 205 TDH), one (1) vertical multi-stage pump (675 gpm @ 110 TDH), ductile iron pipe and fittings from 4 inch through 20 inch, gate valves, silent check valves, 12 and 6 inch swing check valves, 4 inch globe style pressure relief valve associated with surge control, 12 inch plug valve associated with bi-directional flow control, 6 inch globe style flow control valve for low flow conditions, one (1) 6 inch magnetic flowmeter, one (1) 12 inch magnetic flow meter, one (1) 16 inch magnetic flow meter, one (1) 20 inch magnetic flow meter, pipe supports, and painting and coating. Plumbing includes floor drains, service sink, and restroom. Heating and ventilation equipment including natural gas furnace/cooling units, minisplit units, and associated duct work. Electrical consisting of LED lighting, four at 100 Hp, and one at 40 Hp variable frequency drives, electrical switch gear, installation of buried conduit for All written questions must be received by 11:00 a.m Mountain Time (12:00 p.m. (Noon - Central Time) on Thursday December 7, 2023.
Award
Water / Sewer
$5,095,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 12, 2023
January 11, 2024
E Anamosa St & E Philadelphia St, Rapid City, SD
Related To This Project
Rapid City, SD
Bid Date: Feb 14 2023
Rapid City, SD
--
Rapid City, SD
Bid Date: Jul 20 2022
Rapid City, SD
Bid Date: Jan 11 2022
Rapid City, SD
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.