BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Moreno Valley, California. Contact the soliciting agency for additional information.

These projects provide pavement rehabilitation and preservation for approximately 580 local street segments throughout the City. The work includes localized pavement repairs, crack sealing application of Type 2 slurry seal, removal and replacement of asphalt pavement surfaces; installation of permanent traffic video detector; and reestablishment of traffic striping and signs. The projects provides a total of 150 working days for the Contractor to complete the construction of Project No. 801 0090 and 80 working days for Project No. 801 0094. The bidder is solely responsible for on time submission of their electronic bid. The City will only consider bids that have been transmitted successfully and have been issued an ebid confirmation number with a time stamp from the Bid Management System indicating that the bid was submitted successfully. Transmission of bids by any other means will not be accepted. Bidder shall be solely responsible for informing itself with respect to the proper utilization of the bid management system, for ensuring the capability of their computer system to upload the required documents, and for the stability of their internet service. Failure of the bidder to successfully submit an electronic bid shall be at the bidder's sole risk and no relief will be given for late and/or improperly submitted bids. Bidders experiencing any technical difficulties with the bid submission process may contact at (818) 992-1771. Neither the City, makes any guarantee as to the timely availability of assistance, or assurance that any given problem will be resolved by the bid submission deadline. Contact Info Capital Projects Division 951-413-3130 techinfo-capproj@moval.org Online Q&A Yes Q&A Deadline 09/07/2022 2:00 PM (PDT) Pre-Bid Meeting No Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Project Duration 150 Working Days for the Contractor to complete the construction of Project No. 801 0090 and 80 Working Days for Project No. 801 0094 Start/Delivery Date November 1, 2022 The Method of Contractor Selection has not been determined at this Time.

Conceptual

Roads / Highways

Public - City

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
91
Bidding Soon
2,183
All Active Projects
978
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2022

img_map_placeholder

Multiple Locations, Moreno Valley, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.