BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 14, 2025 at 8:00 PM

Updated May 15, 2025

Site work and new construction of a fire / police facility in Brampton, Ontario. Completed plans call for the construction of a 291,000-square-foot, five-story above grade fire / police facility; and for site work for a fire / police facility.

Peel Regional Police (the Agency) is seeking detailed proposals from qualified firms to provide Construction Management Services for the Sir Robert Peel Centre Redevelopment Project for Peel Regional Police. The Agency is looking to redevelop the Sir Robert Peel Centre located on 7750 Hurontario Street, Brampton, Ontario to better accommodate the services it provides to the Region of Peel residents. In 2017, a Long Term Facility Accommodation Plan (LTP) study was initiated by PRP to analyze the growing needs of the communities it serves and thereby provide a road map to meet its space and facility requirements until 2036. PRP has since undertaken and completed various renovations to its facilities based on the recommendations of the study. The final phases of the LTP study recommends the redevelopment of the Sir Robert Peel Centre and 22 Division, which is the subject of this Request for Proposal (RFP). The combined anticipated construction Cost of Work for both phases has been set to $573.0M ($138.0M and $435.0M for Phase 1 and Phase 2, respectively), exclusive of taxes. Phase 1 will deliver a new 3-storey facility in Brampton's Fletcher's Creek South, featuring an upgraded 911 Communications Centre managing up to 3,000 daily emergency calls. The building will also house IT Services, Records, Road Safety, Data Analytics, and other essential departments. Designed for post-disaster resilience, it will include backup electrical and mechanical systems, PV panels, and heat pumps, accommodating over 700 staff. Construction is set to begin in Fall 2025, with substantial completion targeted for Fall 2028. Phase 2 will replace the existing 7,642 sq m facility with a new L-shaped 4-5 storey complex, part of a $450 million investment, scheduled for 2029-2033. Once operational, it will house both civilian and police personnel and operate 24/7. Anticipated Timelines: Phase 1: Construction Management Pre-Construction Services: May 20, 2024 to Q3 2025 Construction Management Construction Services: Q3 2025 to Q3 2028 Anticipated Substantial Completion: Q3 2028 Construction Management Post-Construction Services: Q3 2028 to Q4 2028 Anticipated Timelines: Phase 2: Construction Management Pre-Construction Services: Q2 2027 to Q1 2029 Construction Management Construction Services: Q1 2029 to Q3 2033 Anticipated Substantial Completion: Q3 2033 Construction Management Post-Construction Services: Q3 2033 to Q4 2033 Documents an be obtained at: https://peelregion.bidsandtenders.ca/

Award

Fire / Police

$36,485,317.00

Public - County

New Construction, Site Work

10

5

14

10

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
489
Active Projects
263
Bidding Soon
5,037
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2024

September 1, 2025

Project location map

7750 Hurontario St, Brampton, ON

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.