BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Milwaukee, Wisconsin. Completed plans call for the renovation of a water / sewer project.

The project contemplated herein consists of the Contractor performing repairs to West Plant Secondary Clarifier #2. The time for completion of the Contract shall be one hundred fifty (150) days from the date of Notice to Proceed. A. SCOPE There are eleven (11) final clarifiers in the West Plant of the secondary treatment process located at the Jones Island Water Reclamation Facility. The following specification describes the rebuild of the West Plant Secondary Clarifier #2 turntable. The stop gap minimum clearances have been reached, indicating that a rebuild/replacement of the upper turntables is necessary. Existing Equipment Description The existing clarifier drive for the West Plant Secondary Clarifiers #2 is a H40-LT (CW) 98” Dia. Tow-Bro® model made by Evoqua. A Baldor electric motor serial #VECP3581T with AC power and 1 hp at a max RPM of 1765 are attached to the drives. The drives are a Sew-Eurodrive model R47AM143-KS gear drive with a max RPM of 13 and a ratio of 139.99.

Post-Bid

Water / Sewer

$183,000.00

Public - County

Renovation

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
118
Bidding Soon
2,686
All Active Projects
986
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 26, 2022

October 26, 2022

March 25, 2023

img_map_placeholder

700 E Jones St, Milwaukee, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.