BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 5, 2022 at 8:00 PM

Updated September 15, 2023

Site work and new construction of a pre-engineered storage facility in Milton, Pennsylvania. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

The construction of the 28 x 64 storage building will be pursuant to Timbertech Engineerings design. General contractor shall itemize the three project components in the bid: Precast walls, roof structure with studded walls and flat concrete pad. The price bid shall cover all costs of any nature incident to or growing out of the work of furnishing the required items, including labor, material, equipment, transportation, and all incidental expenses in connection therewith. Each proposal shall be accompanied by a bid bond in the amount of ten percent (10%) of the proposal. Bidders shall submit certificate of insurance for 1 million dollars and proof of workers compensation insurance. PA prevailing wage rates must be paid by the contractor and employees shall not be discriminated against because of race, color, age, religion, sex or national origin. Bids may be held by Limestone Township for up to sixty (60) days from the date of opening for the purpose of reviewing the bids and investigating the qualifications of bidders prior to awarding the contract. Limestone Township reserves the right to reject any or all bids, to waive any informalities in the bidding, to limit the scope of work involved or to negotiate contract amounts.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
80
Bidding Soon
1,467
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2022

November 4, 2022

Project location map

To Be Determined, Milton, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.