Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a power facility in Tierra Amarilla, New Mexico. Working plans call for the renovation of a power facility.
: Proposals may also be submitted electronically by email in pdf format. All other requirements stated in the Solicitation Document remain in effect. Emails should be addressed to: lacbid@lacnm.us. Subject line of the email must contain the following information: RESPONSE RFP23-09 El Vado Fiber Optic Line. No Proposal may be withdrawn after the scheduled closing time for receipt of proposals. All forms of bribes, gratuities, and kickbacks are prohibited by state law. The selected contractor shall provide all labor, materials, and equipment to install and test approximately twelve (12) miles of new, 24-strand Single Mode (SM) fiber optic line per Exhibit E, El Vado Fiber Optic Line Specifications and Exhibit F, El Vado Fiber Optic Line Plan Set, as described below Project will begin at the EL Vado Hydroelectric Power Plant where the new fiber optic line will terminate in a new patch panel in the existing communications rack inside the plant control room located in the first underground level of the plant. The fiber optic line will be routed along the ceiling in a conduit and exit the building on the southeast through a newly cored penetration in the existing concrete powerhouse wall. The fiber optic line will be routed up a rigid riser attached to a 30' tapered steel pole. The overhead portion of the new fiber optic line begins at the new steel pole then extends overhead easterly for approximately 11.9 miles. The fiber optic line will be attached to an existing 69kV transmission powerline, which includes 162 existing 55-foot-tall wooden transmission poles along the path. The fiber optic line will come off the existing 69kV power pole just outside of the Spills Substation fence. The fiber optic line will transition to a new 50' wooden Class 2 "slack" pole near the fenced substation and then go underground again for the last (approximate) 180 feet. The underground duct bank will have two SCH-40 PVC conduits (1 spare) and two 3'x3'x3' pull boxes. The last section of the fiber optic line will leave the last pull box underground to the substation building, then transition through a vertical riser on the substation exterior wall, then penetrate the building and be routed along the ceiling through an existing cable tray. The new fiber optic line will terminate in a new patch panel in the existing communications rack inside the Spills Substation Building. The new fiber optic line will be tested but not placed into service.
Final Planning
Power Plant
$375,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 4, 2022
November 3, 2022
Multiple Locations, Tierra Amarilla, NM
Related To This Project
Tierra Amarilla, NM
Bid Date: Dec 15 2022
Tierra Amarilla, NM
Bid Date: Jun 14 2022
Tierra Amarilla, NM
Bid Date: Jul 21 2022
Tierra Amarilla, NM
Bid Date: Jul 26 2022
Tierra Amarilla, NM
--
Tierra Amarilla, NM
Bid Date: Aug 19 2022
Tierra Amarilla, NM
Bid Date: Aug 19 2022
Tierra Amarilla, NM
Bid Date: Apr 12 2022
Santa Fe, NM
Bid Date: Nov 02 2022
Lovington, NM
--
Fort Sumner, NM
Bid Date: Sep 06 2022
Albuquerque, NM
Bid Date: Nov 10 2022
Albuquerque, NM
--
Roswell, NM
--
Mescalero, NM
Bid Date: Aug 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.