BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 22, 2024 at 7:00 PM

Updated June 14, 2024

Renovation of a water / sewer project in Seattle, Washington. Working plans call for the renovation of a water / sewer project.

As of January 22, 2024, an engineer and a construction manager/general contractor has been selected and this project is in the pre-construction/negotiated phase. The owner is currently working with the engineer on alternatives analysis for the project. It is anticipated construction will start in summer 2026. *The closed solicitation has been included below for reference: The purpose of this contract is to provide engineering and related services to King County Department of Natural Resources and Parks (DNRP), Wastewater Treatment Division (County) for the West Point Treatment Plant Electrical Improvements project. Last Date for Questions 10/26/22 05:00:00 PM Small Business Requirements Apply Yes The Method of Contractor Selection has not been determined at this time.

Pre-Construction/Negotiated

Water / Sewer

$57,000,000.00

Public - County

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
88
Bidding Soon
1,749
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.