BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 23, 2022 at 7:00 PM

Updated January 25, 2024

Demolition, site work, paving, renovation and addition to a mixed-use development in Dallas, Texas. Completed plans call for the addition of a two-story above grade educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The project consists of a new 2-story building addition totaling 77,703 square feet as well as the construction of a storm shelter of 8,441 square feet. These structures are being added to the existing Area D, which is a 2-story building totaling 26,457 square feet and will be renovated as part of this project. Once the new additions and renovations are copleted, the remaining portions of the old school will be abated and demolished, which is also part of this work. Project Number:- J182 P0108 1 Question Deadline 09/16/2022 A. Removal of existing portable classroom buildings B. Site preparation at location of a new classroom building addition, includes but is not limited to excavation, grading, site utilities, storm drainage system, and site paving. C. Construction of a two-story classroom addition D. Renovation of Existing Classroom Building E. Asbestos Abatement and Demolition of Existing Building F. Completion of Sitework Total Estimated Construction Budget (CCL + Allowances) for CSPCS 206946 $29,216,642.00 Completed CSP Package Part 1-A, 1-B and 1-C are due on Wednesday, 10/12/2022 at 2:00 PM (local time). Completed CSP Package Part 2 is due on Thursday, 10/13/2022 at 3:00 PM (local time). Addendum #1 has been issued as of 10-3-2022. Note from Sedalco Construction: Alternates are as follows, and affected bidders are requested to provide pricing for all alternates containing their scope(s) of work: 1. New VAV boxes (15 ea) per Note 1 on M2.1D and M2.02D at existing classroom wing Levels 1 and 2. 2. Replace coils at exisiting fan power boxes (15 ea) with new higher capacity hot water coils and provide new controls/thermostats for existing fan power boxes. Refer to keyed note 1 on sheet M2.01D and M2.02D. 3. Replace ceiling grid and acoustical tile with ACP-1 in rooms 141, 143-146, 148, 156, 157, ST4.1, ST5.1, 228-230, 230A, and 231-234. 4. Add window security film at Secured Lobby H1A where indicated on drawings 5. Add window security film at Secured Vestibule H8-A where indicated on drawings

Award

Educational

$37,863,857.00

Public - City

Addition, Demolition, Paving, Renovation, Site Work

983

82

79

3

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
368
Active Projects
157
Bidding Soon
3,973
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2022

January 30, 2023

Project location map

2911 Northaven Rd, Dallas, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.