BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Wemotaci, Quebec. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Reference Number : 1636140 Deadline for receipt of complaints: 2022-09-06 The NN02 call for tenders consists of carrying out infrastructure work for the entire Nature Nature campsite, formerly Camping Mauricie. The infrastructure works include the repair of the existing rainwater, drinking water and sewer network as well as the construction of a new complete network to meet the growing needs of the campsite, in particular with the arrival of micro-shelters and eco-refuges. Several electrical works are planned to create new electrical entrances both for the new buildings as well as for the campgrounds with services. The call for tenders also includes all work on the site's road network, more specifically, the repair of existing roads, the backfilling of trenches following the work, the creation of ditches and the creation of new roads to access the new section of the campsite. These various works will be carried out in 3 distinct phases to allow the activities of the campsite to continue. Please note that the rentals of the accommodations already in place continue to be rented throughout the work. It is the contractor's responsibility to provide coordination with the owners for the safety of people on the site, the cutoff of water, sewer and electricity services as well as any other major disturbance that could harm vacationers. Work schedule Start date of work - September 19, 2022 Start date of phase 1 of the works - September 19, 2022 End date of phase 1 of the work - October 7, 2022 Maximum date for correction of deficiencies in phase 1 - October 14, 2022 Start date of phase 2 of the works - October 7, 2022 End date of phase 2 of the work - November 2, 2022 Maximum date for correction of deficiencies in phase 2 - November 9, 2022 Start date of phase 3 of the works - November 2, 2022 End date of phase 3 of the work - December 16, 2022 Maximum date for correction of deficiencies in phase 3 - December 23, 2022 Official completion date - December 23, 2022

Award

Roads / Highways

$1,280,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
0
Bidding Soon
30
All Active Projects
10
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2022

September 19, 2022

img_map_placeholder

Multiple Locations, Wemotaci, QC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.