BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a medical facility in Saint Paul, Minnesota. Completed plans call for the renovation of a medical facility.

Project Number- 0423935-003 Construction Services for replacement of the linear accelerator in Veterinary Medical Center North, located on the Saint Paul campus. Refer to the Request for Proposal documents (found in the Attachments tab) for full project details/requirements. Before submitting questions about the RFP via the Questions Tab, read and review the RFX INSTRUCTIONS, REQUIREMENTS, AND RIGHTS RESERVED BY THE UNIVERSITY DOCUMENT and ALL Attributes in the Attributes Tab. These provide valuable information and address frequently asked questions. The Board of Regents of the University of Minnesota (the "University") is requesting Proposals to provide construction services for replacement of the linear accelerator in Veterinary Medical Center North, located on the Saint Paul campus (the "Project"). Veterinary Radiation Oncology is looking to replace the current linac as it is now nine years past the 'end of life' and has significant downtime that negatively affects patient care. The new Varian EDGE linac will build a platform for sustained research success in translational radiation oncology and state-of-the-art infrastructure to secure external funding and perform advanced radiotherapy for improved tumor control. Varian to remove old Linac and install the new one. The selected Respondent will need to complete the area identified in the RFP Documents. Scope of Work includes sprinkler modification, room finishes, Electrical/Lighting, HVAC, utility, and sheetrock work. This Project will be a joint venture with the Veterinary and Med School Departments of Radiation Oncology. BWBR is the Architect/Engineer of Record for the Project. Current Prevailing Wage Rates The selected Respondent will perform the Work for a Contract Sum that shall be a fixed, lump sum that shall include all costs necessary to complete the Work in accordance with the Contract Documents, including Respondent's overhead and profit. The University requires the Project to be substantially complete by no later than January 31, 2023. Anticipate a 20-week lead time for Linear Accelerator delivery on site. Deadline for RFP Questions September 12, 2022 at Noon Anticipated Authorization to Proceed October 3, 2022

Award

Medical

$670,000.00

Public - State/Provincial

Renovation

39

11

5

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
86
Bidding Soon
788
All Active Projects
327
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2022

October 3, 2022

img_map_placeholder

1365 Gortner Ave, Saint Paul, MN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.