BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 14, 2022 at 8:00 PM

Updated November 15, 2023

Site work and paving for a civil project in Hurricane, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and water / sewer project.

The project consists of the installation of approximately 2,880 lineal feet of 12" gravity sewer line, manholes and appurtenances, reconnection of existing laterals, and street repair. The project includes replacing any improvements damaged or removed during the project including, irrigation ditches, asphalt and fencing. The Contractor is responsible to maintain the existing wastewater flows during the progression of the work. The Ash Creek Special Service District reserves the right to reject any or all bids or waive any irregularity.

Post-Bid

Water / Sewer

$420,000.00

Public - City

Paving, Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
14
Bidding Soon
152
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2022

October 13, 2022

Project location map

300 W, Hurricane, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.