BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Live Oak, Florida. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of June 28, 2024, an engineer has been selected and this project is in the design phase. It is anticipated bidding will commence in April 2025 with construction following. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 02 Selection Method : Letter of Response and Abbreviated Technical Proposal Project Description : SR51 (US129) from I-75 (SR93) to South of SR25 (US41) - BDI TRC Members (Subject to Change) : Aaron Kaster Barney Bennette Renee Brinkley This project has been reserved for competition among only small businesses in accordance with the Department's Business Development Initiative (BDI) Program. Letter submittals for this project will only be accepted from firms that meet the definition of a small business set forth by section 337.027, Florida Statutes. The prime consultant submitting a Letter must be a qualified professional services firm and meet the small business definition of section 337.027, Florida Statutes at the time of submittal of the Letter and must maintain this status as a small business through contract execution. The following two projects will be advertised together and four firms will be shortlisted. The top two ranked firms will each receive a contract for one of the projects. 209831-2-32-01: SR51 (US129) from I-75 (SR93) to South of SR25 (US41) - (BDI). Estimated contract amount is $566,049. The project manager is Aaron Kaster. 434318-2-32-01: SR200 (US301) from the Marion County Line North of 203RD ST - (BDI). Estimated contract amount is $712,420. The project manager is Barney Bennette. Shortlist Selection Date/Time 9/26/2022 07:30 pm Phase II Submittal Deadline Date/Time 10/17/2022 11:30 pm Final Selection Date/Time 10/31/2022 07:30 pm Negotiations Period Begin Date 11/04/2022 Negotiations Period Ending Date 1/27/2023 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR 51 (US 129) from I-75 (SR 93) to South of SR 25 (US 41) - BDI

Design

Roads / Highways

$566,049.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
33
Bidding Soon
408
All Active Projects
187
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

img_map_placeholder

US-129, Live Oak, FL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.