Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Chicago Ridge, Illinois. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Qualifications Oak Park Avenue STP Resurfacing Phase III Engineering Services The Village of Chicago Ridge hereby invites Statements of Qualifications from IDOT pre-qualified engineering firms to assist the Village in completing Phase III Engineering for the resurfacing of Oak Park Avenue from Southwest Highway to 107th Street. Construction and Phase III Engineering Services are to be partially funded through the federal Surface Transportation Program (STP); therefore, all work must be completed in accordance with Federal Highway Administration (FHWA) and Illinois Department of Transportation (IDOT) STP guidelines. The project consists of hot-mix asphalt surface removal and replacement, spot curb and gutter improvements, spot sidewalk improvements for ADA compliance, driveway removal and replacement, structure adjustments, construction of a new 11-stall parking lot, pipe culvert removal and replacement, detector loop replacement, landscape restoration, pavement markings, and all collateral work necessary to facilitate construction. It is anticipated that construction will begin in the spring of 2023. The project shall be constructed in accordance with Local Agency Functional Overlay (LAFO) guidelines. Pre-final plans can be accessed through the following link: Oak Park Avenue Plans The Phase III Engineering Services will consist of construction observation and appropriate IDOT/FHWA documentation to implement the subject improvement. Interested firms shall submit Statement of Qualifications that include the following: o A brief statement of the firm's interest in performing the work. o Project Understanding and Approach o Qualifications that demonstrate that the firm has previously performed work on projects with similar scope of services and utilizing Federal Funds. Similar project experience should include the specialized experience listed above such as structure adjustments, detector loop adjustments and landscape restoration. o A list and description of similar projects (4 max.) completed in the last 5 years. o Organizational chart including the names, titles and responsibilities of key individuals. Include sub-consultants and their responsibilities. Resumes of the individuals depicted on the organizational chart shall be included. The Project Manager for this job should be a licensed Professional Engineer with 10 years of experience. o IDOT Pre-Qualification. Firms must be pre-qualified in Special Services -- Construction Inspection All submittals shall include a table of contents and sectional tabs. Submittals shall be thorough, complete and accurate. The following will be used for scoring each of the submittals: Project Understanding and Approach 25% Similar Project Experience 20% Specialized Experience 20% Project Team 25% IDOT Prequalification and Overall Completeness of Submittal 10% No interviews are anticipated to be completed as part of the QBS process Contact for questions or requests for additional information: Stanley Barwock, Director of Public Works Village of Chicago Ridge Phone: (708) 425-7700 Email: sbarwock(dchicagoridge.org
Conceptual
Roads / Highways
$625,000.00
Public - City
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 14, 2023
Oak Park Ave, Chicago Ridge, IL
Related To This Project
Chicago Ridge, IL
Bid Date: Oct 21 2020
Chicago Ridge, IL
Bid Date: Aug 04 2020
Chicago Ridge, IL
Bid Date: Apr 14 2021
Chicago Ridge, IL
Bid Date: Jan 26 2023
Chicago Ridge, IL
Bid Date: Feb 28 2023
Chicago Ridge, IL
Bid Date: Mar 07 2023
Chicago Ridge, IL
Bid Date: Apr 24 2023
Chicago Ridge, IL
Bid Date: May 11 2021
Chicago Ridge, IL
Bid Date: Aug 10 2022
Chicago Ridge, IL
Bid Date: Dec 09 2021
Chicago Ridge, IL
Bid Date: Jul 21 2022
Chicago Ridge, IL
Bid Date: Jul 06 2022
Chicago Ridge, IL
Bid Date: Jul 06 2022
Chicago Ridge, IL
Bid Date: Jun 01 2022
Chicago Ridge, IL
Bid Date: Jan 04 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.