BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a multi-residential development in Fall River, Massachusetts. Completed plans call for the renovation of a multi-residential development.

Contractor Qualification - DCAMM Certificate Elevators 3 & 4 Modernization at Cardinal Medeiros Towers, 1197 Robeson St., Fall River, MA. The Project consists of modernization of two passenger elevators, and upgrades to mechanical, electrical, fire alarm, plumbing and fire protection systems. Deadline for submitting General Contractor Bid questions: Thursday, October 20, 2022, at 5:00 PM In general, the Contractor shall supply all material, labor, equipment, insurance, temporary protection, tools and appliances necessary for the proper completion of the Work as described in the Plans and Specifications, in accordance with good construction practice, and as required by the materials manufacturers. B. Supply all shoring and protection necessary to protect the occupants, building area, building systems, and landscape areas. All means and methods are the responsibility of the Contractor. The Contractor is solely responsible for safety on the job site. A. Remove and dispose of all existing elevator components scheduled for replacement at Elevators #3 & #4. b. Install new elevator components as scheduled for Elevators #3 & #4. c. Coordinate with related activities of GC and other trades, including but not limited to: 1) Related non-elevator demolition. 2) Cleaning of floor grilles and installation of new mesh floor screens in elevator machine room. 3) Infill of abandoned sump pits and related concrete work 4) Elevator pit waterproofing. 5) Masonry work for modifications to existing walls in elevator machine room. 6) Installation of new door in elevator machine room. 7) Construction of 2-hour rated gypsum board assembly shaft wall in machine room. 8) Plastering and painting for lobby walls after removal and installation of new hallway equipment. 9) Preparation and Painting of steel supports in pit. 10) Painting of elevator machine room door, walls, and floor. 11) Installation of prefabricated fiberglass sump pits and sump pumps/

Award

Multi-Residential

$1,376,700.00

Public - City

Renovation

12

19

15

10

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
285
Active Projects
139
Bidding Soon
2,603
All Active Projects
1,083
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2022

December 12, 2022

img_map_placeholder

1197 Robeson St, Fall River, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.