BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a power facility in Tucson, Arizona. Working plans call for site work for a power facility.

**As of September 26, 2022, project back out to bid. No definite date for the rebid.** The Tribe would like to perform a feasibility study to install bid for solar panels on the roof top to offset the building electricity usage and peak demand. Based on the available space it is estimated that the rooftop surface may accommodate a 150kW system including roof edge setbacks and walking on maintenance space. 08/17/2022-Question to be received by 08/29/2022 Answered by Technical questions or requests for clarification shall be directed, in writing, to the email address below. Name: Rick Gonzalez - Tribal Infrastructure Project Manager Pascua Yaqui Tribe 7474 S. Camino De Oeste Tucson, AZ 85746 Telephone: (520) 879-6337 Email Address: Rick.gonzalez@pascuayaqui-nsn.gov Name: Bertha Lopez Company: Pascua Yaqui Tribe Address: 7474 South Camino De Oeste City, State, Zip: Tucson, AZ 85746 Telephone: 520-879-5168 Email Address: bertha.m.lopez@pascuayaqui-nsn.gov The content of all proposals will be kept confidential throughout the selection process and afterward. Copies of any proposal will not be shared with other respondents. Tribe's bid process and laws do not provide for a debriefing. The final selection of the successful respondent(s) is scheduled to be completed by 09/20/2022. The successful respondent will assume their responsibilities on 10/05/2022. The Pascua Yaqui Tribe Health Building does not currently have any sources of renewable energy installed on the premises. The large and flat roofing makes this building a good candidate for a solar photovoltaic (PV) system. The various roof areas are estimated to be 23 years old for the original building and 5 years old for the dental addition. All roofs should be assessed for condition before moving forward with a PV installation. Further engineering will be required to determine if the roof is structurally sound to support the proposed PV array and that the existing electrical system can connect to/tie into the PV array. The firm will work closely with Rick Gonzalez-Tribal Infrastructure Project Manager

Final Planning

Solar Power Generation

$16,000,000.00

Public - Federal

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
6
Bidding Soon
170
All Active Projects
68
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2022

March 26, 2023

img_map_placeholder

4503 Calle Torim, Tucson, AZ


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.