BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Bethel, Connecticut. Contact the soliciting agency for additional information.

The Board of Selectmen upon recommendation of the Procurement Committee reserves the right to accept and/or reject any portion of said bid; to waive any technicality in any bid or part thereof and to accept any bid as provided for in Section 8-13c of the Charter of the Town of Bethel. Sand Specifications 1) Contract period shall commence on the date of the bid award and continue through April 15, 2023. 2) Amount of sand is estimated at approximately 4,000 to 6,000 yards, plus or minus. 3) The sand shall have hard, strong, sharp durable grains processed in nature. The material shall be free of clay, silt, shale, lumps or soft and flaky particles that in the opinion of the Public Works Director or his designee would make the material unsuitable for road de-icing purposes. Absolutely no frozen material will be accepted.Sand must exceed a minimum level of "5" on the Mohs scale of hardness. Limestone sand products are not acceptable. Sand shall have the following gradation: Sieve Designation Percent Passing by Weight 3/8 inch* 100 No. 4 75 - 100 No. 8 40 90 No. 16 20 - 75 No. 30 10 50 No. 100 2 - 15 No. 200 0 3 *Note - use 3/8" by 3/8" screen. Moisture content of sand tested or delivered shall not exceed 2.5% Any material delivered not meeting the gradation listed above shall be removed and replaced at the Contractor's expense. Regular deliveries are to be made weekdays between the hours of 7:00 a.m. and 3:30 p.m. During emergency situations, deliveries can be made from 7:00 a.m. to 7:00 p.m. seven days a week. The town will generally order in amounts of 600-ton increments. The supplier shall provide the material within 5 working days of requested delivery by the town. Company supplying sand shall deliver sand at the minimum rate of 120 tons per day. 4) The material shall be delivered at the direction of the Public Works Supervisor. 5) Each load shall be accompanied by a valid weight slip indicating gross weight, tare weight, and net weight. 6) All weight tickets must be generated by third party certified scale. 7) The successful bidder shall certify to the Town of Bethel that said bidder is the sole supplier of the material delivered. In such cases where the successful bidder is not the sole supplier, the Town will require waivers of lien from the secondary suppliers prior to authorizing payment for said material. Should the successful bidder intend to use subcontractors or other material suppliers, the successful bidder shall submit a list with the names and addresses of any such subcontractors or other material suppliers within five (5) business days of notification of the awarding of bid and prior to commencement of any work and supplying of any materials. 8) Terms of payment: Invoices submitted for payment will be paid as soon as reasonably possible but in no event beyond thirty (30) days unless formal objection is made by the Town of Bethel.

Post-Bid

Municipal

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
451
Active Projects
264
Bidding Soon
4,165
All Active Projects
1,762
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2022

October 21, 2022

img_map_placeholder

Multiple Locations, Bethel, CT

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.